Jul 2005 Sc1 Calendar sc2 sc3 sc4
Sep 2005

Power on / Start

Mode

Power off

Orbit #

Planning period

date

time

date

time

30.07.05

14:20

At L=6 o/b sc1 powers on into 88m28-72m12-cplr

 

 

783

272

 

14:55

At L=6 i/b sc 3,4 power off

 

 

782

272

 

15:50

At end of o/b cusp sc 1,2 change to 88m28-66h36-cplr (-cprl on sc2)

 

 

783

272

 

16:20

At L=6 o/b sc3,4 power on into 88m28-72m12-cplr

 

 

783

272

 

17:50

At end of o/b cusp sc 3,4 change to 88m28-66h36-cplr

 

 

783

272

31.07.05

14:00

Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

 

 

783

272

 

17:00

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

 

 

783

272

01.08.05

17:04

MCP op level test performed, sensors in 68h38-68h38, 4hrs 31 mins before L=6- sc1: 10:44, sc2: 09:49, sc 3,4: 12:49

 

 

783

272

 

17:35

At end of test sc 1,2 change back to 88m28-66h36-cplr (-cprl on sc2); sc 3,4 change back to 88m28-72m12-cplr

 

 

783

272

 

17:50

Sc 1,2 change to 88m28-72m12-cplr (-cprl on sc2) at start of i/b cusp and all power off at L=6

01.08.05

21:35

783

272

01.08.05

23:15

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

784

272

02.08.05

01:25

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

 

 

784

272

04.08.05

04:05

All change to 88m28-72m12-cplr (-cprl on sc2) at start of i/b cusp and all power off at L=6

04.08.05

07:10

784

272

04.08.05

08:50

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

785

272

 

10:30

At end of o/b cusp sc 1,2 change to 88m28-66h36-cplr (-cprl on sc2)

 

 

785

272

 

11:20

Sc1 changes to 88m28-76m16-cplxs-aph-80w28; sc2 to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through o/b lobe; sc3 changes to 88m28-68m08-cplxs-aph-80w28, sc4 to 88m28-68m08-cplxy-apl-nw-aph-nw for BM through auroral zone and cusp

 

 

785

272

 

11:40

Sc3 changes to 88m28-68m08-cplxt-apl-60w08 for cusp part of BM

 

 

785

272

 

12:50

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

 

 

785

272

06.08.05

12:55

All change to 88m28-72m12-cplr (-cprl on sc2) at start of i/b cusp

 

 

785

272

 

15:55

At L=6 i/b sc 1,2 power off

 

 

785

272

06.08.05

17:20

At L=6 o/b sc 1,2 power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

786

272

06.08.05

18:05

At L=6 i/b sc 3,4 power off

 

 

785

273

 

18:55

At end of o/b cusp sc 1,2 change to 88m28-66h36-cplr (-cprl on sc2)

 

 

786

273

 

19:25

At L=6 o/b sc3,4 power on into 88m28-72m12-cplr

 

 

786

273

 

20:00

Sc1 changes to 88m28-76m16-cplxs-aph-80w28; sc2 to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through o/b lobe; sc3 changes to 88m28-68m08-cplxt-apl-60w08, sc4 to 88m28-68m08-cplxy-apl-nw-aph-nw for BM through o/b cusp

 

 

786

273

 

21:30

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

 

 

786

273

08.08.05

20:39

MCP op level test performed, sensors in 68h38-68h38, 4hrs 31 mins before L=6- sc1: 20:39, sc2: 19:39, sc 3,4: 22:59

 

 

786

273

 

21:10

At end of test all change back to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

09.08.05

01:10

786

273

09.08.05

03:00

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

787

273

 

04:55

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

 

 

787

273

 

17:50

Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

 

 

787

273

 

20:50

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

 

 

787

273

11.08.05

07:55

All change to 88m28-72m12-cplr (-cprl on sc2) at start of i/b cusp and all power off at L=6

11.08.05

10:25

787

273

11.08.05

12:00

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

788

273

 

13:30

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

 

 

788

273

13.08.05

15:35

All change to 88m28-72m12-cplr (-cprl on sc2) at start of i/b cusp

 

 

788

273

 

19:05

At L=6 i/b sc 1,2 power off

 

 

788

273

13.08.05

20:40

At L=6 o/b sc 1,2 power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

789

273

13.08.05

21:20

At L=6 i/b sc 3,4 power off

 

 

788

274

13.08.05

23:00

At L=6 o/b sc3,4 power on into 88m28-72m12-cplr

 

 

789

274

 

22:40

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

 

 

789

274

14.08.05

14:55

Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

 

 

789

274

 

16:25

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

 

 

789

274

16.08.05

00:09

MCP op level test performed, sensors in 68h38-68h38, 4hrs 31 mins before L=6- sc1: 00:09, sc2: 23:09, sc 3,4: 02:19

 

 

789

274

 

00:40

At end of test sc1 changes to 88m28-72m12-cplr, sc 2,3,4 change to 88m28-66h36-cplr (-cprl on sc2)

 

 

789

274

 

03:40

At start of i/b cusp sc 2,3,4 change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

16.08.05

04:40

789

274

16.08.05

06:20

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

790

274

 

08:05

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

 

 

790

274

18.08.05

10:45

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2)

 

 

790

274

 

12:35

At L=6 sc2 changes to 88m28-60m00-cprl

 

 

790

274

 

13:00

Sc1 changes to 88m28-68m08-cplxs-aph-80w28 for BM through i/b auroral zone; sc2 to 88m28-60m00-cplxy-apl-nw-aph-nw for BM through perigee; sc3 to 88m28-68m08-cplxt-apl-60w08 and sc4 to 88m28-68m08-cplxy-apl-nw-aph-nw for BM through i/b cusp

 

 

790

274

 

13:30

At L=6 i/b sc1 changes to 88m28-60m00-cplxs-aph-88w36

 

 

790

274

 

14:00

At end of BM sc1 powers off; sc2 power cycles to 88h58-88h58-cnr for further MCP commissioning of HEEA sensor at start of orbit 791; sc 3,4 change to 88m28-72m12-cplr

 

 

790

274

 

15:04

End of sc2 MCP commissioning, instrument changes back to 88m28-72m12-cprl

 

 

790

274

 

15:35

At L=6 i/b sc 3,4 power off

 

 

790

274

18.08.05

15:00

At L=6 o/b sc 1,3,4 power on into 88m28-72m12-cplr

 

 

791

274

 

16:30

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

 

 

791

274

19.08.05

08:06

Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

 

 

791

274

 

10:06

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

 

 

791

274

20.08.05

18:30

All change to 88m28-72m12-cplr (-cprl on sc2) at start of i/b cusp

 

 

791

274

20.08.05

22:30

At L=6 i/b sc 1,2 power off

 

 

791

274

20.08.05

23:20

At L=6 o/b sc2 powers on into 88m28-72m12-cplr (-cprl on sc2)

 

 

792

274

21.08.05

00:55

At L=6 i/b sc 3,4 power off

 

 

791

275

 

02:40

At L=6 o/b sc1,3,4 power on into 88m28-72m12-cplr

 

 

792

275

 

02:25

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

 

 

792

275

 

15:50

Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

 

 

792

275

 

18:50

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

 

 

792

275

22.08.05

10:30

Sc3 changes to 68h38-68h38-cnr for further commissioning of both MCP's

 

 

792

275

 

12:15

Sc3 changes back to 88m28-66h36-cplr at end of commissioning

 

 

792

275

23.08.05

03:29

MCP op level test performed, sensors in 68h38-68h38, 4hrs 31 mins before L=6- sc1: 03:29, sc2: 02:34, sc 3,4: 05:39

 

 

792

275

 

04:00

At end of test all change to 88m28-66h36-cplr (-cprl on sc2)

 

 

792

275

 

05:30

At start of i/b cusp sc 2,3,4 change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

23.08.05

08:00

792

275

23.08.05

09:35

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

793

275

 

11:10

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

 

 

793

275

25.08.05

13:25

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2)and all power off at L=6

 

16:40

793

275

25.08.05

18:10

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

794

275

 

19:55

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

 

 

794

275

 

20:55

Sc1 changes to 88m28-76m16-cplxs-aph-80w28, sc2 to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet; sc3  changes to 88m28-68m08-cplxs-aph-80w28 and sc4 to 88m28-68m08-cplxy-apl-nw-aph-nw for BM through o/b auroral zone and cusp

 

 

794

275

 

21:15

Sc3 changes to 88m28-68m08-cplxt-apl-60w08 at start of o/b cusp

 

 

794

275

 

22:25

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

 

 

794

275

27.08.05

21:55

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2)

 

 

794

275

28.08.05

02:05

At L=6 i/b sc 1,2 power off

 

 

794

275

28.08.05

02:55

At L=6 o/b sc2 powers on into 88m28-72m12-cplr (-cprl on sc2)

 

 

795

275

28.08.05

04:25

At L=6 i/b sc 3,4 power off

 

 

794

276

 

03:55

At L=6 o/b sc1,3,4 power on into 88m28-72m12-cplr

 

 

795

276

 

05:40

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

 

 

795

276

30.08.05

06:39

MCP op level test performed, sensors in 68h38-68h38, 4hrs 31 mins before L=6- sc1: 06:39, sc2: 05:44, sc 3,4: 08:39

 

 

795

276

 

07:10

At end of test all change to 88m28-66h36-cplr (-cprl on sc2)

 

 

795

276

 

08:35

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

30.08.05

11:10

795

276

30.08.05

12:40

At L=6 o/b all power on into 88m28-72m12-cplr

 

 

796

276

 

14:10

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

 

 

796

276

31.08.05

10:10

Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

 

 

796

276

 

12:10

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

 

 

796

276

01.09.05

16:10

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

01.09.05

19:55

796

276