Jan 2006 Sc1 Calendar sc2 sc3 sc4
Mar 2006

Power on / Start
Mode
Power off
Orbit #
Planning period
date
time
date
time
29.01.06
20:25
At L=6 o/b all power on into 88m28-72m12-cplr    
860
298
30.01.06
04:10
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
860
298
 
05:30
At M- o/b + 1 hour sc 2,3,4 power off    
860
298
 
08:55
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
860
298
31.01.06
16:30
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
860
298
 
19:20
At start of BM sc1 changes to, and sc3 powers on into, 88h58-72m12-cplxt-apl-64w12; sc2,4 power on into 88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one level for BM just before i/b MP    
860
298
 
20:50
At end of BM sc 1,2,3 change to 88h58-72m12-cplr, sc4 changes back to 88m28-72m12-cplr    
860
298
 
21:35
At M- i/b sc4 powers on into 88h58-72m12-cplr, MCPs lowered by one level    
860
298
 
21:40
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational    
860
298
 
23:59
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 23:59 on 31st; sc4 at 01:29 on 1st    
860
298
01.02.06
00:30
At end of test all change to 88m28-72m12-cplr (-cprl on sc2)    
860
298
 
03:30
At L=6 i/b sc1,2,3 power off; sc4 changes to 88m28-68m08-cplr, MCPs lowered by one level, for WBD ops    
860
298
01.02.06
05:05
At L=6 o/b sc 1,2,3 power on into, and sc4 changes to, 88m28-72m12-cplr with MCP levels back to operational    
861
298
 
07:25
Sc4 power cycles to 88m28-72m12-cplr at end of WBD ops    
861
298
 
11:45
At end of cusp sc3 changes to 88h58-72m12-cplr and MCPs are lowered by one level    
861
298
 
10:50
At start of BM sc1 changes to 88m28-72m12-cplxt-apl-64w12, sc3 to 88h58-72m12-cplxt-apl-64w12, sc2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM around o/b cusp    
861
298
 
11:50
At end of BM sc 1,2,3 change back to 88h58-72m12-cplr with MCPs lowered by one level, sc4 to 88m28-72m12-cplr    
861
298
 
12:55
At end of cusp sc4 changes to 88h58-72m12-cplr and MCPs are lowered by one level    
861
298
 
15:05
At M- o/b + 1 hour sc 2,3,4 power off    
861
298
 
17:45
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
861
298
 
19:35
At B- o/b sc 2,3,4 power off    
861
298
 
23:40
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
861
298
03.02.06
01:45
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
861
298
 
04:55
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
861
298
 
06:50
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational and all power off at L=6
03.02.06
12:40
861
298
03.02.06
14:35
At L=6 o/b all power on into 88m28-72m12-cplr    
862
298
 
22:10
At end of cusp sc 1,2,3 change to 88h58-72m12-cplr and MCPs are lowered by one level    
862
298
 
23:30
At start of BM sc1,3 change to 88h58-72m12-cplxt-apl-64w12, sc2,4 to 88h58-72m12-cplxy-apl-nw-aph-nw, all MCPs lowered by one level for BM in o/b sheath    
862
298
04.02.06
01:30
At end of BM sc 2,3,4 power off, sc 1 changes back to 88h58-72m12-cplr    
862
298
 
02:40
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
862
298
 
03:45
At B- o/b sc 2,3,4 power off    
862
298
05.02.06
08:50
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
862
298
 
10:55
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
862
298
 
14:00
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
862
298
 
15:55
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational and sc 1,2,3 power off at L=6
05.02.06
22:00
862
298
 
23:30
At L=6 i/b sc4 powers off    
862
299
05.02.06
23:40
At L=6 o/b all power on into 88m28-72m12-cplr    
863
299
06.02.06
02:30
Sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b cusp    
863
299
 
04:12
At end of BM all change back to 88m28-72m12-cplr    
863
299
 
05:10
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
863
299
 
09:05
At M- o/b + 1 hour sc 1,3,4 power off    
863
299
 
11:30
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
863
299
 
08:05
At B- o/b sc 1,3,4 power off    
863
299
07.02.06
18:15
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
863
299
 
20:00
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off    
863
299
 
23:35
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
863
299
08.02.06
01:00
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational    
863
299
 
03:09
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 03:09; sc4 at 04:44    
863
299
 
03:40
At end of test all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6 i/b
08.02.06
06:40
863
299
08.02.06
08:20
At L=6 o/b all power on into 88m28-72m12-cplr    
864
299
 
13:00
Sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b cusp    
864
299
 
14:18
At end of BM all change back to 88m28-72m12-cplr    
864
299
 
16:10
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
864
299
 
18:00
At M- o/b + 1 hour sc 1,3,4 power off    
864
299
 
20:20
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
864
299
 
22:10
At B- o/b sc 1,3,4 power off    
864
299
10.02.06
03:25
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
864
299
 
05:05
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off    
864
299
 
08:40
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
864
299
 
10:05
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational and sc1,2,3 power off at L=6 i/b
10.02.06
16:15
864
299
10.02.06
17:50
At L=6 i/b sc4 powers off    
864
300
 
18:00
At L=6 o/b all power on into 88m28-72m12-cplr    
865
300
11.02.06
01:15
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
865
300
 
02:40
At M- o/b + 1 hour sc 2,3,4 power off    
865
300
 
05:15
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
865
300
 
21:45
Sc 1,3 change to off-72m12-cpxy-apl-64w12-tnl-nw, sc2,4 to off-72m12-cplx-anl-nw for BM in wind at apogee    
865
300
12.02.06
00:45
All change back to off-76m16-cpls at end of BM    
865
300
 
14:15
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
865
300
 
17:25
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
865
300
 
19:10
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational    
865
300
 
21:39
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 21:39; sc4 at 23:04    
865
300
 
22:10
At end of test all change to 88m28-72m12-cplr    
865
300
13.02.06
01:10
At L=6 i/b sc1,2,3 power off, sc4 changes to 88m28-68m08-cplr and MCPs are lowered by one level for perigee pass with WBD ops    
865
300
13.02.06
02:45
At L=6 o/b sc 1,2,3 power on into, and sc4 changes to, 88m28-72m12-cplr, and sc4 MCPs are raised back up to operational level    
866
300
 
05:00
At end of WBD ops sc4 power cycles to 88m28-72m12-cplr    
866
300
 
08:10
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
866
300
 
11:35
Sc 1,3 change to 88h58-72m12-cplxt-apl-64w12, sc2,4 to 88h58-72m12-cplxy-apl-nw-aph-nw for BM in wind at apogee    
866
300
 
13:05
Sc 2,3 power off, sc1,4 change back to 88h58-72m12-cplr at end of BM    
866
300
 
13:30
At M- o/b + 1 hour sc4 powers off    
866
300
 
13:35
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
866
300
 
15:25
At B- o/b sc 2,3,4 power off    
866
300
14.02.06
07:40
IEL to FGM is shut on sc1 while they perform calibration    
866
300
 
07:50
IEL to FGM on sc1 is re-opened    
866
300
 
21:25
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
866
300
 
23:20
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
866
300
15.02.06
02:25
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
866
300
 
04:10
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational    
866
300
 
10:05
At L=6 i/b sc1,3 power off, sc2,4 change to 88m28-68m08-cplr and MCPs are lowered by one level for perigee pass with WBD ops    
866
300
 
10:15
Sc2 powers off at end of WBD ops    
866
300
 
12:00
At L=6 o/b sc 1,2,3 power on into, and sc4 power cycles to, 88m28-72m12-cplr    
867
300
 
19:20
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
867
300
 
20:45
At M- o/b + 1 hour sc2,3,4 power off    
867
300
 
23:10
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
867
300
16.02.06
00:20
At B- o/b sc 2,3,4 power off    
867
300
17.02.06
06:35
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
867
300
 
08:30
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
867
300
 
11:30
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
867
300
 
13:15
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational    
867
300
 
19:40
Sc 1,2,3 power off at L=6 i/b    
867
300
17.02.06
21:05
At L=6 i/b sc4 powers off    
867
301
17.02.06
21:20
At L=6 o/b all power on into 88m28-72m12-cplr    
868
301
18.02.06
03:20
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
868
301
 
06:20
At M- o/b + 1 hour sc 1,3,4 power off    
868
301
 
08:10
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
868
301
 
09:55
At B- o/b sc 1,3,4 power off    
868
301
19.02.06
15:55
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
868
301
 
17:35
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off    
868
301
 
20:55
At M- i/b sc1,3 power on into 88h58-72m12-cplr, MCPs lowered by one level    
868
301
 
21:40
At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12; sc2 changes to, and sc4 powers on into 88h58-72m12-cplxy-apl-nw-aph-nw for BM through MP/cusp    
868
301
 
23:10
At end of BM sc 1,2,3 change to 88m28-72m12-cplr and MCPs are raised back up to operational, sc4 changes back to 88h58-72m12-cplr    
868
301
 
23:35
At M+ i/b sc4 changes to 88m28-72m12-cplr and LEEA MCP is raised back up to operational    
868
301
20.02.06
00:49
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 00:49; sc4 at 02:14    
868
301
 
01:20
At end of test all change to 88m28-72m12-cplr    
868
301
 
04:20
At L=6 i/b sc1,2,3 power off, sc4 changes to 88m28-68m08-cplr and MCPs are lowered by one level for perigee pass with WBD ops    
868
301
 
07:00
Sc4 powers off at end of WBD ops    
868
301
20.02.06
05:55
At L=6 o/b all power on into 88m28-72m12-cplr    
869
301
 
13:25
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
869
301
 
15:20
At M- o/b + 1 hour sc 1,3,4 power off    
869
301
 
17:00
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
869
301
 
18:50
At B- o/b sc 1,3,4 power off    
869
301
22.02.06
01:00
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
869
301
 
02:40
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off    
869
301
 
06:05
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
869
301
 
07:30
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and all power off at L=6
22.02.06
13:45
869
301
22.02.06
15:35
At L=6 o/b all power on into 88m28-72m12-cplr    
870
301
 
19:35
At start of BM sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through cusp/MP    
870
301
 
22:35
At end of BM sc 1,2,3 change to 88h58-72m12-cplr and MCPs are lowered by one level, sc4 changes back to 88m28-72m12-cplr    
870
301
 
23:50
At end of cusp sc4 changes to 88h58-72m12-cplr and MCPs are lowered by one level    
870
301
23.02.06
00:20
At M- o/b + 1 hour sc 2,3,4 power off    
870
301
 
02:00
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
870
301
 
03:50
At B- o/b sc 1,3,4 power off    
870
301
24.02.06
10:00
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
870
301
 
11:35
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off    
870
301
 
15:05
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
870
301
 
16:30
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and all power off at L=6    
870
301
25.02.06
00:10
Sc2 powers on into 88m28-72m12-cplr at L=6 o/b    
871
301
25.02.06
00:25
At L=6 o/b sc 1,3,4 power on into 88m28-72m12-cplr
871
302
05:30
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level
871
302
09:25
At M- o/b + 1 hour sc 2,3,4 power off
871
302
11:00
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level
871
302
26.02.06
20:45
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off
871
302
23:55
At M- i/b sc 2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level
871
302
27.02.06
01:35
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCP is raised back up to operational
871
302
04:04
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 04:04; sc4 at 05:39
871
302
04:35
At end of test all change to 88m28-72m12-cplr
871
302
07:35
At L=6 i/b sc1,2,3 power off, sc4 changes to 88m28-68m08-cplr and MCPs are lowered by one level for perigee pass with WBD ops
871
302
09:59
5 mins before start of eclipse sc4 changes to 88m28-60m00-cplr, LEEA MCP lowered by one level, with internal sunpulse
871
302
10:40
5 mins after end of eclipse sc4 changes back to 88m28-68m08-cplr, LEEA MCP lowered by one level, with external sunpulse
871
302
27.02.06
09:25
At L=6 o/b sc 1,2,3 power on into, and sc4 changes to, 88m28-72m12-cplr; sc4 MCP's are also raised back up to operational
872
302
11:30
At end of WBD ops sc4 power cycles to 88m28-72m12-cplr
872
302
16:35
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level
872
302
18:05
At M- o/b + 1 hour sc 2,3,4 power off
872
302
20:00
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level
872
302
21:50
At B- o/b sc 2,3,4 power off
872
302
28.02.06
05:15
5 mins before start of eclipse sc1 changes to off-60m00-cpls, LEEA MCP lowered by one level, with internal sunpulse
872
302
06:04
5 mins after end of eclipse sc1 changes back to off-76m16-cpls, LEEA MCP lowered by one level, with external sunpulse
872
302
01.03.06
04:10
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level
872
302
05:45
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off
872
302
09:05
At M- i/b sc2 powers on into 88h58-72m12-cplr, MCPs lowered by one level
872
302
09:20
At start of BM sc1 changes to, and sc3 powers on into, 88h58-72m12-cplxt-apl-64w12; sc2 changes to, and sc4 powers on into 88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one levelon all, for BM through MP
872
302
11:20
At end of BM sc 1,2,3 change to 88m28-72m12-cplr and MCPs are raised back up to operational, sc4 changes back to 88h58-72m12-cplr
872
302
11:55
At M+ i/b sc4 changes to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and all power off at L=6
01.03.06
17:15
872
302