$pageFileName = "feb2006.php" ?> $pageTitle = "feb2006.php" ?> include "/home/html/www_plasma/plasma_top.inc" ?>
Jan 2006 | Sc1 Calendar | sc2 | sc3 | sc4 |
Power on / Start |
Mode |
Power
off |
Orbit
# |
Planning
period |
||
date |
time |
date |
time |
|||
29.01.06 |
20:25 |
At L=6 o/b all power on into 88m28-72m12-cplr | 860 |
298 |
||
30.01.06 |
04:10 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 860 |
298 |
||
05:30 |
At M- o/b + 1 hour sc 2,3,4 power off | 860 |
298 |
|||
08:55 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 860 |
298 |
|||
31.01.06 |
16:30 |
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off | 860 |
298 |
||
19:20 |
At start of BM sc1 changes to, and sc3 powers on into, 88h58-72m12-cplxt-apl-64w12; sc2,4 power on into 88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one level for BM just before i/b MP | 860 |
298 |
|||
20:50 |
At end of BM sc 1,2,3 change to 88h58-72m12-cplr, sc4 changes back to 88m28-72m12-cplr | 860 |
298 |
|||
21:35 |
At M- i/b sc4 powers on into 88h58-72m12-cplr, MCPs lowered by one level | 860 |
298 |
|||
21:40 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational | 860 |
298 |
|||
23:59 |
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 23:59 on 31st; sc4 at 01:29 on 1st | 860 |
298 |
|||
01.02.06 |
00:30 |
At end of test all change to 88m28-72m12-cplr (-cprl on sc2) | 860 |
298 |
||
03:30 |
At L=6 i/b sc1,2,3 power off; sc4 changes to 88m28-68m08-cplr, MCPs lowered by one level, for WBD ops | 860 |
298 |
|||
01.02.06 |
05:05 |
At L=6 o/b sc 1,2,3 power on into, and sc4 changes to, 88m28-72m12-cplr with MCP levels back to operational | 861 |
298 |
||
07:25 |
Sc4 power cycles to 88m28-72m12-cplr at end of WBD ops | 861 |
298 |
|||
11:45 |
At end of cusp sc3 changes to 88h58-72m12-cplr and MCPs are lowered by one level | 861 |
298 |
|||
10:50 |
At start of BM sc1 changes to 88m28-72m12-cplxt-apl-64w12, sc3 to 88h58-72m12-cplxt-apl-64w12, sc2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM around o/b cusp | 861 |
298 |
|||
11:50 |
At end of BM sc 1,2,3 change back to 88h58-72m12-cplr with MCPs lowered by one level, sc4 to 88m28-72m12-cplr | 861 |
298 |
|||
12:55 |
At end of cusp sc4 changes to 88h58-72m12-cplr and MCPs are lowered by one level | 861 |
298 |
|||
15:05 |
At M- o/b + 1 hour sc 2,3,4 power off | 861 |
298 |
|||
17:45 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 861 |
298 |
|||
19:35 |
At B- o/b sc 2,3,4 power off | 861 |
298 |
|||
23:40 |
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 861 |
298 |
|||
03.02.06 |
01:45 |
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off | 861 |
298 |
||
04:55 |
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 861 |
298 |
|||
06:50 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational and all power off at L=6 | 03.02.06 |
12:40 |
861 |
298 |
|
03.02.06 |
14:35 |
At L=6 o/b all power on into 88m28-72m12-cplr | 862 |
298 |
||
22:10 |
At end of cusp sc 1,2,3 change to 88h58-72m12-cplr and MCPs are lowered by one level | 862 |
298 |
|||
23:30 |
At start of BM sc1,3 change to 88h58-72m12-cplxt-apl-64w12, sc2,4 to 88h58-72m12-cplxy-apl-nw-aph-nw, all MCPs lowered by one level for BM in o/b sheath | 862 |
298 |
|||
04.02.06 |
01:30 |
At end of BM sc 2,3,4 power off, sc 1 changes back to 88h58-72m12-cplr | 862 |
298 |
||
02:40 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 862 |
298 |
|||
03:45 |
At B- o/b sc 2,3,4 power off | 862 |
298 |
|||
05.02.06 |
08:50 |
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 862 |
298 |
||
10:55 |
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off | 862 |
298 |
|||
14:00 |
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 862 |
298 |
|||
15:55 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational and sc 1,2,3 power off at L=6 | 05.02.06 |
22:00 |
862 |
298 |
|
23:30 |
At L=6 i/b sc4 powers off | 862 |
299 |
|||
05.02.06 |
23:40 |
At L=6 o/b all power on into 88m28-72m12-cplr | 863 |
299 |
||
06.02.06 |
02:30 |
Sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b cusp | 863 |
299 |
||
04:12 |
At end of BM all change back to 88m28-72m12-cplr | 863 |
299 |
|||
05:10 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 863 |
299 |
|||
09:05 |
At M- o/b + 1 hour sc 1,3,4 power off | 863 |
299 |
|||
11:30 |
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 863 |
299 |
|||
08:05 |
At B- o/b sc 1,3,4 power off | 863 |
299 |
|||
07.02.06 |
18:15 |
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 863 |
299 |
||
20:00 |
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off | 863 |
299 |
|||
23:35 |
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 863 |
299 |
|||
08.02.06 |
01:00 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational | 863 |
299 |
||
03:09 |
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 03:09; sc4 at 04:44 | 863 |
299 |
|||
03:40 |
At end of test
all change to 88m28-72m12-cplr (-cprl on sc2) |
08.02.06 |
06:40 |
863 |
299 |
|
08.02.06 |
08:20 |
At L=6 o/b all power on into 88m28-72m12-cplr | 864 |
299 |
||
13:00 |
Sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b cusp | 864 |
299 |
|||
14:18 |
At end of BM all change back to 88m28-72m12-cplr | 864 |
299 |
|||
16:10 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 864 |
299 |
|||
18:00 |
At M- o/b + 1 hour sc 1,3,4 power off | 864 |
299 |
|||
20:20 |
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 864 |
299 |
|||
22:10 |
At B- o/b sc 1,3,4 power off | 864 |
299 |
|||
10.02.06 |
03:25 |
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 864 |
299 |
||
05:05 |
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off | 864 |
299 |
|||
08:40 |
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 864 |
299 |
|||
10:05 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational and sc1,2,3 power off at L=6 i/b | 10.02.06 |
16:15 |
864 |
299 |
|
10.02.06 |
17:50 |
At L=6 i/b sc4 powers off | 864 |
300 |
||
18:00 |
At L=6 o/b all power on into 88m28-72m12-cplr | 865 |
300 |
|||
11.02.06 |
01:15 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 865 |
300 |
||
02:40 |
At M- o/b + 1 hour sc 2,3,4 power off | 865 |
300 |
|||
05:15 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 865 |
300 |
|||
21:45 |
Sc 1,3 change to off-72m12-cpxy-apl-64w12-tnl-nw, sc2,4 to off-72m12-cplx-anl-nw for BM in wind at apogee | 865 |
300 |
|||
12.02.06 |
00:45 |
All change back to off-76m16-cpls at end of BM | 865 |
300 |
||
14:15 |
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off | 865 |
300 |
|||
17:25 |
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 865 |
300 |
|||
19:10 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational | 865 |
300 |
|||
21:39 |
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 21:39; sc4 at 23:04 | 865 |
300 |
|||
22:10 |
At end of test all change to 88m28-72m12-cplr | 865 |
300 |
|||
13.02.06 |
01:10 |
At L=6 i/b sc1,2,3 power off, sc4 changes to 88m28-68m08-cplr and MCPs are lowered by one level for perigee pass with WBD ops | 865 |
300 |
||
13.02.06 |
02:45 |
At L=6 o/b sc 1,2,3 power on into, and sc4 changes to, 88m28-72m12-cplr, and sc4 MCPs are raised back up to operational level | 866 |
300 |
||
05:00 |
At end of WBD ops sc4 power cycles to 88m28-72m12-cplr | 866 |
300 |
|||
08:10 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 866 |
300 |
|||
11:35 |
Sc 1,3 change to 88h58-72m12-cplxt-apl-64w12, sc2,4 to 88h58-72m12-cplxy-apl-nw-aph-nw for BM in wind at apogee | 866 |
300 |
|||
13:05 |
Sc 2,3 power off, sc1,4 change back to 88h58-72m12-cplr at end of BM | 866 |
300 |
|||
13:30 |
At M- o/b + 1 hour sc4 powers off | 866 |
300 |
|||
13:35 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 866 |
300 |
|||
15:25 |
At B- o/b sc 2,3,4 power off | 866 |
300 |
|||
14.02.06 |
07:40 |
IEL to FGM is shut on sc1 while they perform calibration | 866 |
300 |
||
07:50 |
IEL to FGM on sc1 is re-opened | 866 |
300 |
|||
21:25 |
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 866 |
300 |
|||
23:20 |
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off | 866 |
300 |
|||
15.02.06 |
02:25 |
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 866 |
300 |
||
04:10 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational | 866 |
300 |
|||
10:05 |
At L=6 i/b sc1,3 power off, sc2,4 change to 88m28-68m08-cplr and MCPs are lowered by one level for perigee pass with WBD ops | 866 |
300 |
|||
10:15 |
Sc2 powers off at end of WBD ops | 866 |
300 |
|||
12:00 |
At L=6 o/b sc 1,2,3 power on into, and sc4 power cycles to, 88m28-72m12-cplr | 867 |
300 |
|||
19:20 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 867 |
300 |
|||
20:45 |
At M- o/b + 1 hour sc2,3,4 power off | 867 |
300 |
|||
23:10 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 867 |
300 |
|||
16.02.06 |
00:20 |
At B- o/b sc 2,3,4 power off | 867 |
300 |
||
17.02.06 |
06:35 |
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 867 |
300 |
||
08:30 |
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off | 867 |
300 |
|||
11:30 |
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 867 |
300 |
|||
13:15 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational | 867 |
300 |
|||
19:40 |
Sc 1,2,3 power off at L=6 i/b | 867 |
300 |
|||
17.02.06 |
21:05 |
At L=6 i/b sc4 powers off | 867 |
301 |
||
17.02.06 |
21:20 |
At L=6 o/b all power on into 88m28-72m12-cplr | 868 |
301 |
||
18.02.06 |
03:20 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 868 |
301 |
||
06:20 |
At M- o/b + 1 hour sc 1,3,4 power off | 868 |
301 |
|||
08:10 |
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 868 |
301 |
|||
09:55 |
At B- o/b sc 1,3,4 power off | 868 |
301 |
|||
19.02.06 |
15:55 |
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 868 |
301 |
||
17:35 |
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off | 868 |
301 |
|||
20:55 |
At M- i/b sc1,3 power on into 88h58-72m12-cplr, MCPs lowered by one level | 868 |
301 |
|||
21:40 |
At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12; sc2 changes to, and sc4 powers on into 88h58-72m12-cplxy-apl-nw-aph-nw for BM through MP/cusp | 868 |
301 |
|||
23:10 |
At end of BM sc 1,2,3 change to 88m28-72m12-cplr and MCPs are raised back up to operational, sc4 changes back to 88h58-72m12-cplr | 868 |
301 |
|||
23:35 |
At M+ i/b sc4 changes to 88m28-72m12-cplr and LEEA MCP is raised back up to operational | 868 |
301 |
|||
20.02.06 |
00:49 |
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 00:49; sc4 at 02:14 | 868 |
301 |
||
01:20 |
At end of test all change to 88m28-72m12-cplr | 868 |
301 |
|||
04:20 |
At L=6 i/b sc1,2,3 power off, sc4 changes to 88m28-68m08-cplr and MCPs are lowered by one level for perigee pass with WBD ops | 868 |
301 |
|||
07:00 |
Sc4 powers off at end of WBD ops | 868 |
301 |
|||
20.02.06 |
05:55 |
At L=6 o/b all power on into 88m28-72m12-cplr | 869 |
301 |
||
13:25 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 869 |
301 |
|||
15:20 |
At M- o/b + 1 hour sc 1,3,4 power off | 869 |
301 |
|||
17:00 |
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 869 |
301 |
|||
18:50 |
At B- o/b sc 1,3,4 power off | 869 |
301 |
|||
22.02.06 |
01:00 |
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 869 |
301 |
||
02:40 |
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off | 869 |
301 |
|||
06:05 |
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 869 |
301 |
|||
07:30 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and all power off at L=6 | 22.02.06 |
13:45 |
869 |
301 |
|
22.02.06 |
15:35 |
At L=6 o/b all power on into 88m28-72m12-cplr | 870 |
301 |
||
19:35 |
At start of BM sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through cusp/MP | 870 |
301 |
|||
22:35 |
At end of BM sc 1,2,3 change to 88h58-72m12-cplr and MCPs are lowered by one level, sc4 changes back to 88m28-72m12-cplr | 870 |
301 |
|||
23:50 |
At end of cusp sc4 changes to 88h58-72m12-cplr and MCPs are lowered by one level | 870 |
301 |
|||
23.02.06 |
00:20 |
At M- o/b + 1 hour sc 2,3,4 power off | 870 |
301 |
||
02:00 |
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 870 |
301 |
|||
03:50 |
At B- o/b sc 1,3,4 power off | 870 |
301 |
|||
24.02.06 |
10:00 |
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 870 |
301 |
||
11:35 |
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off | 870 |
301 |
|||
15:05 |
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 870 |
301 |
|||
16:30 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and all power off at L=6 | 870 |
301 |
|||
25.02.06 |
00:10 |
Sc2 powers on into 88m28-72m12-cplr at L=6 o/b | 871 |
301 |
||
25.02.06 |
00:25 |
At L=6 o/b sc 1,3,4 power on into 88m28-72m12-cplr | 871 |
302 |
||
05:30 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 871 |
302 |
|||
09:25 |
At M- o/b + 1 hour sc 2,3,4 power off | 871 |
302 |
|||
11:00 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 871 |
302 |
|||
26.02.06 |
20:45 |
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off | 871 |
302 |
||
23:55 |
At M- i/b sc 2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 871 |
302 |
|||
27.02.06 |
01:35 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCP is raised back up to operational | 871 |
302 |
||
04:04 |
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 04:04; sc4 at 05:39 | 871 |
302 |
|||
04:35 |
At end of test all change to 88m28-72m12-cplr | 871 |
302 |
|||
07:35 |
At L=6 i/b sc1,2,3 power off, sc4 changes to 88m28-68m08-cplr and MCPs are lowered by one level for perigee pass with WBD ops | 871 |
302 |
|||
09:59 |
5 mins before start of eclipse sc4 changes to 88m28-60m00-cplr, LEEA MCP lowered by one level, with internal sunpulse | 871 |
302 |
|||
10:40 |
5 mins after end of eclipse sc4 changes back to 88m28-68m08-cplr, LEEA MCP lowered by one level, with external sunpulse | 871 |
302 |
|||
27.02.06 |
09:25 |
At L=6 o/b sc 1,2,3 power on into, and sc4 changes to, 88m28-72m12-cplr; sc4 MCP's are also raised back up to operational | 872 |
302 |
||
11:30 |
At end of WBD ops sc4 power cycles to 88m28-72m12-cplr | 872 |
302 |
|||
16:35 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 872 |
302 |
|||
18:05 |
At M- o/b + 1 hour sc 2,3,4 power off | 872 |
302 |
|||
20:00 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 872 |
302 |
|||
21:50 |
At B- o/b sc 2,3,4 power off | 872 |
302 |
|||
28.02.06 |
05:15 |
5 mins before start of eclipse sc1 changes to off-60m00-cpls, LEEA MCP lowered by one level, with internal sunpulse | 872 |
302 |
||
06:04 |
5 mins after end of eclipse sc1 changes back to off-76m16-cpls, LEEA MCP lowered by one level, with external sunpulse | 872 |
302 |
|||
01.03.06 |
04:10 |
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 872 |
302 |
||
05:45 |
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off | 872 |
302 |
|||
09:05 |
At M- i/b sc2 powers on into 88h58-72m12-cplr, MCPs lowered by one level | 872 |
302 |
|||
09:20 |
At start of BM sc1 changes to, and sc3 powers on into, 88h58-72m12-cplxt-apl-64w12; sc2 changes to, and sc4 powers on into 88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one levelon all, for BM through MP | 872 |
302 |
|||
11:20 |
At end of BM sc 1,2,3 change to 88m28-72m12-cplr and MCPs are raised back up to operational, sc4 changes back to 88h58-72m12-cplr | 872 |
302 |
|||
11:55 |
At M+ i/b sc4 changes to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and all power off at L=6 | 01.03.06 |
17:15 |
872 |
302 |