Dec 2005 Sc1 Calendar sc2 sc3 sc4
Feb 2006

Power on / Start

Mode

Power off

Orbit #

Planning period

date

time

date

time

29.12.05

22:05

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

847

293

30.12.05

00:05

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

847

293

 

07:45

At M+ o/b all change to 88h58-72m12-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level

   

847

293

 

15:45

At B+ o/b sc2 changes to 88h58-76m16-cprl

   

847

293

31.12.05

15:30

At B+ i/b sc2 changes to 88h58-72m12-cplr

   

847

293

 

21:30

At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, LEEA MCP’s lowered by one level, and sc2 HEEA MCP is raised back up to operational

   

847

293

 

23:15

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and sc 1,2,3 power off at L=6

01.01.06

05:05

847

293

01.01.06

06:15

At L=6 o/b sc2 powers on into 88m28-72m12-cprl

   

848

293

01.01.06

06:45

At L=6 i/b sc4 powers off

   

848

294

 

06:40

At L=6 o/b sc 1,3,4 power on into 88m28-72m12-cplr

   

848

294

 

17:15

At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level

   

848

294

 

19:20

At M- o/b + 1 hour sc2,3,4 power off

   

848

294

02.01.06

01:55

At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

848

294

03.01.06

01:30

At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off

   

848

294

 

06:45

At M- i/b sc 1,2 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

848

294

 

07:15

At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12, and sc2 changes to, and sc4 powers on into, 88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one level for BM around i/b MP

   

848

294

 

08:45

At end of BM sc 1,2,3 change to 88m28-72m12-cplr and MCPs are raised back up to operational; sc4 changes to 88h58-72m12-cplr

   

848

294

 

10:10

At M+ i/b sc4 changes to 88m28-72m12-cplr and MCPs are raised back up to operational

   

848

294

 

10:39

MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1 at 10:39; sc2 at 10:14; sc3 at 10:59; sc4 at 12:29

   

848

294

 

11:10

At end of test all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

03.01.06

14:10

848

294

03.01.06

16:05

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

849

294

04.01.06

02:05

At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level

   

849

294

 

04:10

At M- o/b + 1 hour sc2,3,4 power off

   

849

294

 

10:15

At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

849

294

 

10:55

At B- o/b sc 2,3,4 power off

   

849

294

05.01.06

08:00

At B- i/b sc 2,3 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

849

294

 

09:35

At start of BM sc 1,3 change to off-72m12-cpxy-apl-64w12-tnl-nw; sc2 changes to, and sc4 powers on into, off-76m16-cplx-anl-nw for BM around i/b BS

   

849

294

 

11:05

At end of BM sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr; sc3,4 to off-76m16-cpls; sc2 powers off

   

849

294

 

11:20

At B+ i/b sc3,4 power off

   

849

294

 

15:55

At M- i/b sc 2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

849

294

 

17:40

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and all power off at L=6

05.01.06

23:40

849

294

06.01.06

01:15

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

850

294

 

07:10

At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level until all power off for manoeuvre firings

06.01.06

11:00

850

294

   

Manoeuvre firings on all spacecraft (attitude slews)

       

06.01.06

22:00

At end of firings sc1 powers on into off-76m16-cpls, LEEA MCP lowered by one level

   

850

294

07.01.06

17:03

At start of BM sc1 changes to, and sc3 powers on into, off-72m12-cpxy-apl-64w12-tnl-nw; sc2,4 change to off-76m16-cplx-anl-nw for BM around i/b BS

   

850

294

 

20:45

At end of BM sc2 changes to 88h58-72m12-cplr; sc4 to off-76m16-cpls; sc1,3 power off

   

850

294

 

22:00

At B+ i/b sc4 powers off

   

850

294

08.01.06

01:05

At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

850

294

 

02:45

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and all power off at L=6

08.01.06

08:20

850

294

08.01.06

09:30

At L=6 o/b sc2 powers on into 88m28-72m12-cprl

   

851

294

08.01.06

09:55

At L=6 o/b sc 1,3,4 power on into 88m28-72m12-cplr

   

851

295

 

18:50

At end of cusp sc2 changes to 88h58-72m12-cplr and MCPs are lowered by one level

   

851

295

 

19:20

At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12, sc2,4 change to 88h58-72m12-cplxy-apl-nw-aph-nw, all MCPs lowered by one level, and sc4 changes to 88m28-72m12-cplxy-apl-nw-aph-nw for BM around o/b cusp/MP

   

851

295

 

20:20

At end of BM sc 1,2,3 change to 88h58-72m12-cplr; sc4 changes to 88m28-72m12-cplr

   

851

295

 

21:00

At end of cusp sc4 changes to 88h58-72m12-cplr and MCPs are lowered by one level

   

851

295

 

21:55

At M- o/b + 1 hour sc1,3,4 power off

   

851

295

09.01.06

03:00

At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

851

295

 

05:15

At B- o/b sc1,3,4 power off

   

851

295

10.01.06

03:25

At B- i/b sc1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

851

295

 

05:40

At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off

   

851

295

 

10:10

At M- i/b 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

851

295

 

11:50

At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational

   

851

295

 

14:19

MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,3 at 14:19; sc2 at 13:49; sc4 at 15:59

   

851

295

 

14:50

At end of test all change to 88m28-72m12-cplr (-cprl on sc2)

   

851

295

 

17:50

At L=6 i/b sc 3,4 power off; sc 2,4 change to 88m28-68m08-cplr (-cprl on sc2) with MCP's lowered by one level for WBD ops through perigee

   

851

295

 

19:07

Sc 1,2 power off at end of WBD ops

   

851

295

10.01.06

19:35

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

852

295

11.01.06

03:00

At end of cusp sc3 changes to 88h58-72m12-cplr and MCPs are lowered by one level

   

852

295

 

03:30

At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12, sc2,4 change to 88h58-72m12-cplxy-apl-nw-aph-nw, all MCPs lowered by one level for BM around o/b MP

   

852

295

 

06:00

At end of BM all change to 88h58-72m12-cplr

   

852

295

 

06:40

At M- o/b + 1 hour sc 1,3,4 power off

   

852

295

 

11:20

At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

852

295

 

13:30

At B- o/b sc 1,3,4 power off

   

852

295

12.01.06

12:40

At B- i/b sc1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

852

295

 

14:50

At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off

   

852

295

 

19:15

At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

852

295

 

20:55

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and sc2 powers off at L=6

13.01.06

02:20

852

295

13.01.06

02:37

Sc 1,3,4 power off for firings at perigee

   

852

295

   

Manoeuvre firings on all spacecraft (orbit trims)

       

13.01.06

13:13

At end of firings all power on into 88h58-72m12-cplr with MCPs lowered by one level

   

853

295

 

15:30

At M- o/b + 1 hour sc 1,3,4 power off

   

853

295

 

19:55

At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

853

295

 

22:00

At B- o/b sc 1,3,4 power off

   

853

295

14.01.06

22:05

At start of BM sc1,3 power on into off-72m12-cpxy-apl-64w12-tnl-nw; sc2 changes to, and sc4 powers on into off-72m12-cplx-anl-nw, LEEA MCP lowered by one level for BM around BS

   

853

295

15.01.06

01:05

At end of BM sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr; sc4 to off-76m16-cpls; sc1,3 power off

   

853

295

 

01:40

At B+ i/b sc4 powers off

   

853

295

 

04:25

At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

853

295

 

06:00

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and sc 1,2,3 power off at L=6

15.01.06

11:35

853

295

15.01.06

13:00

At L=6 o/b sc2 powers on into 88m28-72m12-cprl

   

854

295

15.01.06

14:20

At L=6 i/b sc4 powers off

   

854

296

 

13:30

At L=6 o/b sc 1,3,4 power on into 88m28-72m12-cplr

   

854

296

 

22:25

At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level

   

854

296

 

23:40

At M- o/b + 1 hour sc 2,3,4 power off

   

854

296

16.01.06

03:20

At B+ o/b sc 2,3 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

854

296

 

04:20

At start of BM sc1 power cycles to, and sc3 changes to off-72m12-cpxy-apl-64w12-tnl-nw; sc2 changes to and sc4 powers on into off-72m12-cplx-anl-nw, all LEEA MCPs lowered by one level for BM around BS

   

854

296

 

05:50

At end of BM all change to off-76m16-cpls

   

854

296

17.01.06

09:25

At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off

   

854

296

 

12:55

At M- i/b sc 2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

854

296

 

15:05

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational

   

854

296

 

17:39

MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,3 at 17:39; sc2 at 17:14; sc4 at 19:14

   

854

296

 

18:10

At end of test all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

17.01.06

21:10

854

296

17.01.06

22:50

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

855

296

18.01.06

02:15

At start of BM sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw for BM around o/b cusp

   

855

296

 

05:15

At end of BM sc 1,3,4 change to 88h58-72m12-cplr and MCPs are lowered by one level, sc2 changes back to 88m28-72m12-cplr

   

855

296

 

06:00

At end of cusp sc2 changes to 88h58-72m12-cplr and MCPs are lowered by one level

   

855

296

 

09:25

At M- o/b + 1 hour sc 2,3,4 power off

   

855

296

 

13:15

At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

855

296

 

14:05

At B- o/b sc 2,3,4 power off

   

855

296

19.01.06

16:35

At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

855

296

 

18:40

At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off

   

855

296

 

22:40

At M- i/b sc 2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

855

296

20.01.06

00:15

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational and all power off at L=6

20.01.06

05:55

855

296

20.01.06

07:25

At L=6 o/b all power on into 88m28-72m12-cplr

   

856

296

 

16:20

At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level

   

856

296

 

18:15

At M- o/b + 1 hour sc 2,3,4 power off

   

856

296

 

21:55

At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

856

296

 

22:45

At B- o/b sc 2,3,4 power off

   

856

296

22.01.06

01:35

At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

856

296

 

03:50

At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off

   

856

296

 

07:15

At M- i/b sc 2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

856

296

 

09:20

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational

   

856

296

 

15:15

At L=6 i/b sc3 powers off; sc1,2 change to 88m28-68m08-cplr, MCP’s one below operational, for WBD ops

   

856

296

 

16:40

Sc 1,2 power off at end of WBD ops

   

856

296

22.01.06

17:15

Sc4 changes to 88m28-68m08-cplr for WBD ops

   

857

297

 

18:15

Sc4 powers off at end of WBD ops

   

857

297

22.01.06

17:05

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

857

297

 

21:40

At start of BM sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw for BM around o/b cusp

   

857

297

 

23:10

At end of BM all change back to 88m28-72m12-cplr

   

857

297

23.01.06

01:15

At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level

   

857

297

 

03:10

At M- o/b + 1 hour sc 1,3,4 power off

   

857

297

 

06:35

At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

857

297

 

08:30

At B- o/b sc 1,3,4 power off

   

857

297

24.01.06

11:10

At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

857

297

 

13:05

At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off

   

857

297

 

16:55

At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

857

297

 

18:30

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational

   

857

297

 

20:54

MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,3 at 20:54; sc2 at 20:29; sc4 at 22:24

   

857

297

 

21:25

At end of test all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

25

00:25

857

297

25.01.06

02:00

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

858

297

 

07:25

At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level

   

858

297

 

12:10

At M- o/b + 1 hour sc 1,3,4 power off

   

858

297

 

15:20

At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

858

297

 

17:15

At B- o/b sc 1,3,4 power off

   

858

297

26.01.06

20:20

At B- i/b sc 1,3 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

858

297

 

20:55

At start of BM sc 1,3 change to off-72m12-cpxy-apl-64w12-tnl-nw; sc2 changes to and sc4 powers on into off-72m12-cplx-anl-nw, all LEEA MCPs lowered by one level for BM around i/b BS

   

858

297

 

22:25

At end of BM sc 1,3 power off; sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; and sc4 changes to off-76m16-cpls

   

858

297

 

23:30

At B+ i/b sc4 powers off

   

858

297

27.01.06

01:55

At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

858

297

 

03:30

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational

   

858

297

 

09:05

At L=6 i/b sc3 powers off; sc 1,2,4 change to 88m28-68m08-cplr for WBD ops, MCPs lowered by one level

   

858

297

 

10:25

Sc1,2 power off at end of WBD ops

   

858

297

27.01.06

10:50

At L=6 o/b sc 1,2,3 power on into, and sc4 changes to, 88m28-72m12-cplr

   

859

297

 

13:40

Sc4 power cycles to 88m28-72m12-cplr at end of WBD ops

   

859

297

 

18:05

At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12, sc2 changes to 88h58-72m12-cplxy-apl-nw-aph-nw, all MCPs lowered by one level, and sc4 changes to 88m28-72m12-cplxy-apl-nw-aph-nw for BM around o/b cusp/MP

   

859

297

 

19:35

At end of BM sc 1,2,3 change to 88h58-72m12-cplr and MCPs are lowered by one level, sc4 changes back to 88m28-72m12-cplr

   

859

297

 

20:30

At end of cusp sc4 changes to 88h58-72m12-cplr and MCPs are lowered by one level

   

859

297

 

21:05

At M- o/b + 1 hour sc 1,3,4 power off

   

859

297

28.01.06

00:05

At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

859

297

 

01:55

At B- o/b sc 1,3,4 power off

   

859

297

29.01.06

05:35

At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

859

297

 

07:25

At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off

   

859

297

 

11:00

At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

859

297

 

12:35

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational and sc 1,2,3 power off at L=6

29.01.06

18:40

859

297

29.01.06

20:15

At L=6 i/b sc4 powers off

   

859

298

29.01.06

20:25

At L=6 o/b all power on into 88m28-72m12-cplr

   

860

298

30.01.06

04:10

At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level

   

860

298

 

05:30

At M- o/b + 1 hour sc 2,3,4 power off

   

860

298

 

08:55

At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

860

298

31.01.06

16:30

At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off

   

860

298

 

19:20

At start of BM Sc1 changes to, and sc3 powers on into, 88h58-72m12-cplxt-apl-64w12; sc2,4 power on into 88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one level for BM just before i/b MP

   

860

298

 

20:50

At end of BM sc 1,2,3 change to 88h58-72m12-cplr, sc4 changes back to 88m28-72m12-cplr

   

860

298

 

21:35

At M- i/b sc4 powers on into 88h58-72m12-cplr, MCPs lowered by one level

   

860

298

 

21:40

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational

   

860

298

 

23:59

MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 23:59 on 31st; sc4 at 01:29 on 1st

   

860

298

01.02.06

00:30

At end of test all change to 88m28-72m12-cplr (-cprl on sc2)

   

860

298

 

03:30

At L=6 i/b sc1,2,3 power off; sc4 changes to 88m28-68m08-cplr, MCPs lowered by one level, for WBD ops

   

860

298