May 2004 Sc1 Calendar sc2 sc3 sc4
Jul 2004

Power on / Start

Mode

Power off

Orbit #

Planning period

date

time

date

time

30.05.04

11:12

Sc1 powers on into 88h58-72m12-cplr, MCP levels 2 below operational at start of AI

   

604

211

31.05.04

18:59

Sc1 changes to, and sc3 powers on into 88h58-72m12-cplxt-apl-64w12, and sc 2,4 power on into 88h58-72m12-cplxy-apl-nw-aph-nw, all MCPs at operational level, for BM around i/b MP

   

604

211

 

21:11

All change to 88h58-72m12-cplr (-cprl on sc2) at end of BM

   

604

211

 

22:15

All change to 88m28-66h36-cplr (-cprl on sc2) at end of cusp

   

604

211

01.06.04

02:30

Sc3 changes to 88h58-68m08-cplr for ASPOC ops

   

604

211

 

06:35

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 2hrs 40 mins before sc1 L=6

   

604

211

 

07:15

Sc1,2,4 change to 88m28-72m12-cplr (-cprl on sc2), sc3 to 88m28-68m08-cplr at end of test and all power off at L=6

01.06.04

09:15

604

211

01.06.04

11:00

At L=6 all power into 88m28-72m12-cplr (-cprl on sc2)

   

605

211

 

13:00

2 hours after L=6 all change to 88h58-72m12-cplr (-cprl on sc2)

   

605

211

 

18:09

Sc1,3 change to 88h58-72m12-cplxt-apl-64w12, sc 2,4 to 88h58-72m12-cplxy-apl-nw-aph-nw, for BM around o/b MP

   

605

211

 

20:21

Sc 2,3,4 power off, sc1 changes to 88h58-72m12-cplr and its MCP levels are lowered by 2 at end of BM, until powering off at end of AI

03.06.04

03:26

605

211

   

Firings on all sc. End of main manoeuvres, only trims remain. Sc now at 1000km separation. Separation will now gradually increase to 1300km for 2005 cusp season

       

03.06.04

13:01

All power on into 88m28-66h36-cplr (-cprl on sc2) at start of AI

   

605

211

 

16:00

All change to 88m28-72m12-cplr (-cprl on sc2) 2 hours before L=6 and all power off at L=6

03.06.04

18:00

605

211

03.06.04

19:35

At L=6 o/b sc 1,2,4 power on into 88m28-72m12-cplr (-cprl on sc2), sc3 into 88m28-68m08-cplr for ASPOC ops on sc 3

   

606

211

 

21:35

2 hours after L=6 sc 1,2,4 change to 88h58-72m12-cplr (-cprl on sc2), sc3 to 88h58-68m08-cplr

   

606

211

04.06.04

03:37

Sc1 changes to 88h58-72m12-cplxt-apl-64w12, sc2,4 to 88h58-72m12-cplxy-apl-nw-aph-nw, and sc3 to 88h58-68m08-cplxt-apl-60w08 for BM centred on MP with ASPOC ops

   

606

211

 

05:13

Sc 2,3,4 power off, sc1 changes to 88h58-72m12-cplr and its MCP levels are lowered by 2 at end of BM until powering off at end of AI

   

606

211

05.06.04

10:50

Sc 2,3,4 power on into 88h58-72m12-cplr and sc1 MCP levels are raised back up to operational at M- i/b

   

606

211

 

18:40

All change to 88m28-66h36-cplr (-cprl on sc2) at end of cusp

   

606

211

 

20:15

Sc3 changes to 88h58-68m08-cplr for ASPOC ops

   

606

211

06.06.04

00:55

2 hours after L=6 sc 1,2,4 change to 88h58-72m12-cplr (-cprl on sc2) and all power off at L=6

06.06.04

02:55

606

211

06.06.04

04:50

At L=6 all power into 88m28-72m12-cplr (-cprl on sc2)

   

607

212

 

06:50

2 hours after L=6 all change to 88h58-72m12-cplr (-cprl on sc2)

   

607

212

 

12:06

Sc1,3 change to 88h58-72m12-cplxt-apl-64w12, sc 2,4 to 88h58-72m12-cplxy-apl-nw-aph-nw, for BM around o/b MP

   

607

212

 

15:24

Sc 1,3,4 power off, sc2 changes to 88h58-72m12-cprl and its MCP levels are lowered by 2 at end of BM, until powering off at end of AI

07.06.04

07:43

607

212

   

Firings on all sc

       

07.06.04

17:06

Sc2 powers on into 88h58-72m12-cprl for sheath, MCPs two levels below operational at start of AI

   

607

212

 

19:10

Sc 1,3,4 power on into 88h58-72m12-cplr and sc2 MCP levels are raised back up to operational at M- i/b

   

607

212

08.06.04

05:30

All change to 88m28-66h36-cplr (-cprl on sc2) at end of cusp

   

607

212

 

09:45

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 2hrs 40 mins before sc1 L=6

   

607

212

 

10:25

All change to 88m28-72m12-cplr (-cprl on sc2) at end of test and all power off at L=6

08.06.04

12:25

607

212

 

13:42

At L=5 sc 1,3 power on into 88m28-68m08-cplxs-aph-80w28, sc 2,4 into 88m28-68m08-cplxy-apl-nw-aph-nw for BM centred on auroral zone with ASPOC ops

   

608

212

 

15:18

At end of BM, sc 1,2,4 change to 88m28-72m12-cplr (-cprl on sc2), sc3 to 88m28-68m08-cplr for ASPOC ops

   

608

212

 

16:05

2 hours after L=6 sc 1,2,4 change to 88h58-72m12-cplr (-cprl on sc2), sc3 to 88h58-68m08-cplr

   

608

212

 

23:20

Sc3 changes to 88h58-72m12-cplr at end of ASPOC ops

   

608

212

09.06.04

00:50

Sc 1,3,4 power off and sc2 MCP levels are lowered by 2 at M- o/b

   

608

212

10.06.04

03:25

Sc 1,3,4 power on into 88h58-72m12-cplr and sc2 MCP levels are raised back up to operational at M- i/b

   

608

212

 

14:20

Sc3 changes to 88h58-68m08-cplr for ASPOC ops

   

608

212

 

15:05

Sc 1,2,4 change to 88m28-66h36-cplr (-cprl on sc2), sc3 to 88m28-68m08-cplr at end of cusp

   

608

212

 

19:05

Sc 1,2,4 change to 88m28-72m12-cplr (-cprl on sc2) 2 hours before L=6 and all power off at L=6

10.06.04

21:05

608

212

10.06.04

22:40

At L=6 all power into 88m28-72m12-cplr (-cprl on sc2)

   

609

212

11.06.04

00:40

2 hours after L=6 all change to 88h58-72m12-cplr (-cprl on sc2)

   

609

212

 

07:36

Sc1,3 change to 88h58-72m12-cplxt-apl-64w12, sc 2,4 to 88h58-72m12-cplxy-apl-nw-aph-nw, for BM around o/b MP

   

609

212

 

09:24

All change to 88h58-72m12-cprl (-cprl on sc2) at end of BM

   

609

212

 

10:25

Sc 1,3,4 power off, sc2 MCP levels are lowered by 2 at M- o/b

   

609

212

12.06.04

11:30

Sc 1,3,4 power on into 88h58-72m12-cplr and sc2 MCP levels are raised back up to operational at M- i/b

   

609

212

 

20:15

All change to 88m28-66h36-cplr (-cprl on sc2) at end of cusp

   

609

212

13.06.04

04:30

All change to 88m28-72m12-cplr (-cprl on sc2) 2 hours before L=6 and all power off just before L=6 at end of AI

13.06.04

06:27

609

212

   

Firings on all sc

       

13.06.04

15:40

All power on into 88h58-72m12-cplr (-cprl on sc2) at start of AI

   

610

213

 

20:05

Sc 1,2,3 power off, sc4 MCP levels are lowered by 2 at M- o/b

   

610

213

14.06.04

20:54

Sc1,3 power on into 88h58-68m08-cplxt-apl-60w08, sc 2 powers on into, and sc4 changes to 88h58-68m08-cplxy-apl-nw-aph-nw and its MCPs are raised back up to operational, for BM around i/b MP

   

610

213

15.06.04

00:00

All change to 88h58-72m12-cprl (-cprl on sc2) at end of BM

   

610

213

 

08:40

Sc3 changes to 88h58-68m08-cplr for ASPOC ops

   

610

213

 

09:50

Sc 1,2,4 change to 88m28-66h36-cplr (-cprl on sc2), sc3 to 88m28-68m08-cplr at end of cusp

   

610

213

 

12:45

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 2hrs 40 mins before sc1 L=6

   

610

213

 

13:25

Sc 1,2,4 change to 88m28-72m12-cplr (-cprl on sc2), sc3 to 88m28-68m08-cplr at end of test and all power off at L=6

15.06.04

15:25

610

213

15.06.04

17:00

At L=6 all power into 88m28-72m12-cplr (-cprl on sc2)

   

611

213

 

19:00

2 hours after L=6 all change to 88h58-72m12-cplr (-cprl on sc2)

   

611

213

16.06.04

05:50

Sc 1,2,3 power off, sc4 MCP levels are lowered by 2 at M- o/b

   

611

213

 

09:42

Sc 1,3 power on into 88h58-68l08-cplxt-apl-60w08, and sc2 powers on into and sc4 changes to 88h58-68l08-cplxy-apl-nw-aph-nw, MCPs at op level for BM

   

611

213

 

10:00

Sc 1,3 change to 88h58-60l00-cplxt-apl-52w00, and sc2,4 change to 88h58-60l00-cplxy-apl-nw-aph-nw with internal sunpulse for lunar eclipse

   

611

213

 

11:02

Sc 1,3 change back to 88h58-68l08-cplxt-apl-60w08, and sc2,4 back to 88h58-68l08-cplxy-apl-nw-aph-nw, and all back to spacecraft sunpulse at end of eclipse. Note SPOS erroneously changed back to 176 instead of 1200 - so all SPOS wrong from now on

   

611

213

 

11:12

Sc 1,2,3 power off, sc4 changes to 88h58-72m12-cprl and its MCP levels are lowered by 2 at end of BM

   

611

213

17.06.04

02:50

Sc 1,2,3 power on into 88h58-72m12-cplr (-cprl on sc2) and sc4 MCP levels are raised back up to operational at M- i/b

   

611

213

 

16:50

All change to 88m28-66h36-cplr (-cprl on sc2) at end of cusp

   

611

213

 

22:05

All change to 88m28-72m12-cplr (-cprl on sc2) 2 hours before L=6 and all power off at L=6

18.06.04

00:05

611

213

18.06.04

01:55

At L=6 sc 1,2,4 power on into 88m28-72m12-cplr (-cprl on sc2), sc3 into 88m28-68m08-cplr for ASPOC ops on sc 3

   

612

213

 

03:55

2 hours after L=6 sc 1,2,4 change to 88h58-72m12-cplr (-cprl on sc2), sc3 to 88h58-68m08-cplr

   

612

213

 

13:48

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for correlator test in BM just after MP, MCP levels at operational

   

612

213

 

14:39

MCP levels are lowered by two half way through BM

   

612

213

 

15:30

Sc 1,2,3 power off, sc4 changes to 88h58-72m12-cprl at end of BM

   

612

213

19.06.04

10:05

Sc 1,2,3 power on into 88h58-72m12-cplr (-cprl on sc2) and sc4 MCP levels are raised back up to operational at M- i/b

   

612

213

 

22:35

All change to 88m28-66h36-cplr (-cprl on sc2) at end of cusp

   

612

213

20.06.04

02:36

Sc3 changes to 88h58-68m08-cplr for ASPOC ops

   

612

213

 

07:40

Sc 1,2,4 change to 88m28-72m12-cplr (-cprl on sc2) 2 hours before L=6 and all power off at L=6

20.06.04

09:40

612

213

   

Firings on all sc

       

20.06.04

19:00

All power on into 88h58-72m12-cplr (-cprl on sc2) at start of AI

   

613

214

 

21:15

Sc1,3 change to 88h58-68m08-cplxt-apl-60w08, sc2,4 to 88h58-68m08-cplxy-apl-nw-aph-nw for BM around MP

   

613

214

21.06.04

00:21

At end of BM all change back to 88h58-72m12-cplr (-cprl on sc2) and sc 1,2 MCP levels are lowered by 2

   

613

214

 

17:00

Sc 1,2  MCP levels are raised by 2 at M- i/b

   

613

214

22.06.04

12:50

All change to 88m28-66h36-cplr (-cprl on sc2) at end of cusp

   

613

214

 

15:45

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 2hrs 40 mins before sc1 L=6

   

613

214

 

16:25

All change to 88m28-72m12-cplr (-cprl on sc2) at end of test and all power off at L=6

22.06.04

18:25

613

214

   

End of manoeuvres, sc now at 1000km separation

       

22.06.04

20:00

At L=6 sc 1,2,4 power on into 88m28-72m12-cplr (-cprl on sc2), sc3 into 88m28-68m08-cplr for ASPOC ops

   

614

214

 

22:00

Sc 1,2,4 change to 88h58-72m12-cplr (-cprl on sc2), sc3 to 88h58-68m08-cplr

   

614

214

23.06.04

03:20

Sc3 changes to 88h58-72m12-cplr at end of ASPOC ops

   

614

214

 

07:15

Sc1,3 change to 88h58-68m08-cplxt-apl-60w08, sc2,4 to 88h58-68m08-cplxy-apl-nw-aph-nw for BM around MP

   

614

214

 

10:15

All change back to 88h58-72m12-cplr (-cprl on sc2) at end of BM and sc 1,2 MCP levels are lowered by 2

   

614

214

 

22:40

Sc 1,2 MCP levels are raised by 2 at M- i/b

   

614

214

24.06.04

18:25

All change to 88m28-66h36-cplr (-cprl on sc2) at end of cusp

   

614

214

 

21:05

Sc3 changes to 88m28-68m08-cplr for ASPOC ops

   

614

214

25.06.04

01:40

2 hours before L=6 sc 1,2,4 change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

25.06.04

01:40

614

214

25.06.04

05:30

At L=6 all power into 88m28-72m12-cplr (-cprl on sc2)

   

615

214

 

07:30

2 hours after L=6 all change to 88h58-72m12-cplr (-cprl on sc2)

   

615

214

 

22:05

Sc 1,2 MCP levels are lowered by 2 3 hours after o/b MP

   

615

214

26.06.04

08:35

Sc 1,2 MCP levels are raised by 2 3 hours after i/b MP

   

615

214

27.06.04

07:05

All change to 88m28-66h36-cplr (-cprl on sc2) at end of cusp

   

615

214

 

10:55

All change to 88m28-72m12-cplr (-cprl on sc2) 2 hours before L=6 and all power off at L=6

27.06.04

12:55

615

214

27.06.04

14:30

At L=6 sc 1,2,4 power on into 88m28-72m12-cplr (-cprl on sc2), sc3 into 88m28-68m08-cplr for ASPOC ops

   

616

215

 

16:30

2 hours after L=6 sc 1,2,4 change to 88h58-72m12-cplr (-cprl on sc2), sc3 to 88h58-68m08-cplr

   

616

215

 

21:50

Sc3 changes to 88h58-72m12-cplr at end of ASPOC ops

   

616

215

28.06.04

04:40

Sc1,3 change to 88h58-68m08-cplxt-apl-60w08, sc2,4 to 88h58-68m08-cplxy-apl-nw-aph-nw for BM around MP

   

616

215

 

07:40

All change back to 88h58-72m12-cplr (-cprl on sc2) at end of BM and sc 1,2 MCP levels are lowered by 2

   

616

215

 

14:15

Sc 1,2 MCP levels are raised by 2 3 hours after i/b MP

   

616

215

29.06.04

14:55

Sc3 changes to 88h58-68m08-cplr for ASPOC ops

   

616

215

 

18:55

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 2hrs 40 mins before sc1 L=6

   

616

215

 

19:35

Sc 1,2,4 change to 88m28-72m12-cplr (-cprl on sc2), sc3 to 88m28-68m08-cplr at end of test and all power off at L=6

29.06.04

21:35

616

215

29.06.04

23:15

At L=6 all power into 88m28-72m12-cplr (-cprl on sc2)

   

617

215

30.06.04

01:15

2 hours after L=6 all change to 88h58-72m12-cplr (-cprl on sc2)

   

617

215

 

18:15

At the orbital position used in orbit 616, sc 1,2 MCP levels are lowered by 2 (no sheath is predicted)

   

617

215

 

23:15

At the orbital position used in orbit 616, sc 1,2 MCP levels are raised by 2 (no sheath is predicted)

   

617

215

02.07.04

05:05

All change to 88m28-72m12-cplr (-cprl on sc2) 2 hours before L=6

   

617

215

 

07:05

At L=6 all change to 88h58-60m00-cplr (-cprl on sc2) for perigee pass, sc 1,2 MCP levels 2 below operational

   

617

215