May 2005 | Sc1 Calendar | sc2 | sc3 | sc4 |
Power on / Start |
Mode |
Power off |
Orbit # |
Planning period |
||
date |
time |
date |
time |
|||
31.05.05 |
08:10 |
At L=6 all power on into 88m28-72m12-cplr
(-cprl on sc2) |
|
|
758 |
263 |
|
16:00 |
At
end of o/b cusp sc 2,3,4 change to 88h58-72m12-cplr; MCPs at gain of
as close to 0.5 as possible (-cprl on sc2) |
|
|
758 |
263 |
|
17:20 |
Sc 2,3,4 power off at M- o/b |
|
|
758 |
263 |
|
20:00 |
Sc1
changes to, and sc3 powers on into, 88m28-72m12-cplxt-apl-64w12, sc
2,4 power on into 88m28-72m12-cplxy-apl-nw-aph-nw; MCPs at gain of
as close to 0.5 as possible for BM through o/b MP |
|
|
758 |
263 |
01.06.05 |
00:00 |
Sc1 changes back to 88h58-72m12-cplr,
sc 1,3,4 power off at end of BM |
|
|
758 |
263 |
|
01:43 |
Sc1 powers off for firings |
|
|
758 |
263 |
|
|
Firings |
|
|
758 |
263 |
|
13:45 |
Sc1 powers on into 88h58-72m12-cplr,
MCPs at gain of as close to 0.5 as possible
after firings end |
|
|
758 |
263 |
|
20:30 |
Sc2 powers on into 88h58-72m12-cplr
(-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at
M- i/b |
|
|
758 |
263 |
|
21:42 |
Sc 1,2 power off for firings |
|
|
758 |
263 |
|
|
Firings |
|
|
758 |
263 |
02.06.05 |
12:20 |
Sc 1,3,4 power on into 88m28-72m12-cplr
(-cprl on sc2) after firings, then all power off at L=6 |
02.06.05 |
16:30 |
758 |
263 |
02.06.05 |
18:05 |
At L=6 all power on into 88m28-72m12-cplr
(-cprl on sc2) |
|
|
759 |
263 |
03.06.05 |
02:15 |
At
end of o/b cusp all change to 88h58-72m12-cplr; MCPs at gain of as
close to 0.5 as possible (-cprl on sc2) |
|
|
759 |
263 |
|
03:40 |
Sc 2,3,4 power off at M- o/b |
|
|
759 |
263 |
04.06.05 |
05:30 |
Sc 2,4 power on into 88h58-72m12-cplr
(-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at
M- i/b |
|
|
759 |
263 |
|
07:30 |
Sc2 changes to 88m28-72m12-cplr
(-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp |
|
|
759 |
263 |
|
09:00 |
Sc1
changes to, and sc3 powers on into, 88m28-72m12-cplxt-apl-64w12, sc
2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw; MCPs at gain of as close
to 0.5 as possible on sc 1,3,4 and at operational on sc2, for
BM through i/b MP/cusp |
|
|
759 |
263 |
|
11:30 |
Sc 3,4 MCPs are returned to
operational levels at start of i/b cusp |
|
|
759 |
263 |
|
12:00 |
Sc 2,3,4 change to 88m28-72m12-cplr
with MCPs at operational levels; sc1 changes back to 88h58-72m12-cplr
with MCPs at gain of as close to 0.5 as possible at end of BM |
|
|
759 |
263 |
|
13:15 |
Sc1 changes to 88m28-72m12-cplr
(-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp, and all
power off at L=6 |
05.06.05 |
02:50 |
759 |
263 |
05.06.05 |
04:40 |
At L=6 all power on into 88m28-72m12-cplr
(-cprl on sc2) |
|
|
760 |
264 |
|
07:00 |
At
end of o/b cusp sc2 changes to 88h58-72m12-cprl; MCPs at gain of as
close to 0.5 as possible |
|
|
760 |
264 |
|
08:45 |
All power off for firings |
|
|
760 |
264 |
|
|
Firings
on sc 1,2 |
|
|
760 |
264 |
|
19:23 |
At
end of firings sc2 powers on into 88h58-72m12-cprl; MCPs at gain of
as close to 0.5 as possible |
|
|
760 |
264 |
|
20:00 |
Sc1,3
power on into, 88m28-72m12-cplxt-apl-64w12; sc2 changes to, and sc4
changes to 88m28-72m12-cplxy-apl-nw-aph-nw; MCPs at gain of as close
to 0.5 as possible on sc 1,3,4 and at operational on sc2, for
BM in o/b sheath |
|
|
760 |
264 |
|
22:48 |
Sc2 changes back to 88h58-72m12-cprl,
sc 1,3,4 power off at end of BM |
|
|
760 |
264 |
06.06.05 |
05:39 |
Sc2 powers off for firings |
|
|
760 |
264 |
|
|
Firings
on sc 1,2 |
|
|
760 |
264 |
|
11:38 |
Sc2 powers on into 88h58-72m12-cprl,
MCPs at gain of as close to 0.5 as possible
after firings end |
|
|
760 |
264 |
|
17:55 |
Sc4 powers on into 88h58-72m12-cplr,
MCPs set to gain of as close to 0.5 as possible at M- i/b |
|
|
760 |
264 |
|
16:30 |
Sc2 changes to 88m28-72m12-cprl
and MCPs are returned to operational levels
at start of i/b cusp |
|
|
760 |
264 |
|
19:00 |
Sc1,3
power on into, 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw;
MCPs at gain of as close to 0.5 as possible on sc 1,3,4 and at operational
on sc2, for BM through i/b MP/cusp |
|
|
760 |
264 |
|
20:05 |
Sc4 MCPs are returned to operational
levels at start of i/b cusp |
|
|
760 |
264 |
|
21:00 |
Sc 2,4 change to 88m28-72m12-cplr
(-cprl on sc2) with MCPs at operational levels; sc1,3 change to 88h58-72m12-cplr
with MCPs at gain of as close to 0.5 as possible at end of BM |
|
|
760 |
264 |
|
23:20 |
Sc1,3 change to 88m28-72m12-cplr
and MCPs are returned to operational levels
at start of i/b cusp |
|
|
760 |
264 |
07.06.05 |
09:14 |
MCP
op level test performed, sensors in 68h38-68h38, performed 4hrs 31 mins
before L=6 - note for first time test carried out at different
times as spacecraft are so far apart |
|
|
760 |
264 |
|
09:45 |
All change back to 88m28-72m12-cplr
(-cprl on sc2) at end of test and all
power off at L=6 |
07.06.05 |
13:45 |
760 |
264 |
07.06.05 |
15:25 |
At L=6 all power on into 88m28-72m12-cplr
(-cprl on sc2) |
|
|
761 |
264 |
|
16:50 |
At
end of o/b cusp sc2,3,4 change to 88h58-72m12-cplr (-cprl on
sc2), MCPs at gain of as close to 0.5 as
possible |
|
|
761 |
264 |
|
21:32 |
Sc1,3
change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw
for BM through o/b MP/cusp |
|
|
761 |
264 |
|
23:08 |
Sc2,3,4 change back to 88h58-72m12-cplr
(-cprl on sc2), sc1 to 88m28-72m12-cplr at end of BM |
|
|
761 |
264 |
|
23:50 |
At
end of o/b cusp sc1 changes to 88h58-72m12-cplr, MCPs at gain of as close to 0.5 as possible |
|
|
761 |
264 |
08.06.05 |
01:25 |
Sc 1,3,4 power off at M- o/b |
|
|
761 |
264 |
09.06.05 |
07:00 |
Sc 1,3,4 power on into 88h58-72m12-cplr,
MCPs set to gain of as close to 0.5 as possible at M- i/b |
|
|
761 |
264 |
|
08:33 |
Sc3 powers off for firings |
|
|
761 |
264 |
|
|
Firings
on sc3 |
|
|
761 |
264 |
|
09:20 |
Sc1,2,4 change to 88m28-72m12-cplr
(-cprl on sc2) and MCPs are returned to operational levels at start of i/b
cusp and power off at L=6 |
09.06.05 |
23:55 |
761 |
264 |
10.06.05 |
01:40 |
At L=6 sc 1,2,4 power on into
88m28-72m12-cplr (-cprl on sc2) |
|
|
762 |
264 |
|
05:19 |
After firings sc3 powers on
into 88m28-72m12-cplr |
|
|
762 |
264 |
|
06:51 |
Sc1 powers off for firings |
|
|
762 |
264 |
|
|
Firings
on sc1 |
|
|
762 |
264 |
|
22:40 |
At
end of o/b cusp sc 2,3,4 change to 88h58-72m12-cplr (-cprl on
sc2), MCPs at gain of as close to 0.5 as
possible |
|
|
762 |
264 |
|
12:55 |
Sc
3,4 power off at M- o/b |
|
|
762 |
264 |
|
15:20 |
Sc2 powers off for firings |
|
|
762 |
264 |
|
|
Firings
on sc2 |
|
|
762 |
264 |
11.06.05 |
16:45 |
Sc 1,3,4 power on into 88h58-72m12-cplr,
MCPs set to gain of as close to 0.5 as possible at M- i/b |
|
|
762 |
264 |
|
19:08 |
Sc1 powers off for firings |
|
|
762 |
264 |
|
|
Firings
on sc1 |
|
|
762 |
264 |
|
16:00 |
Sc2 powers on into 88m28-72m12-cprl
after firings |
|
|
762 |
264 |
|
18:45 |
Sc 3,4 change to 88m28-72m12-cplr
and MCPs are returned to operational levels
at start of i/b cusp |
|
|
762 |
264 |
12.06.05 |
01:25 |
Sc2 powers off at L=6 i/b |
|
|
762 |
264 |
|
03:15 |
Sc2 powers on into 88m28-72m12-cprl
at L=6 o/b, orbit 763 |
|
|
762 |
264 |
|
07:24 |
Sc1 powers on into 88m28-72m12-cprl
after firings |
|
|
762 |
264 |
|
08:58 |
Sc1,3
change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw
for BM through auroral zones |
|
|
762 |
264 |
|
10:34 |
All change back to 88m28-72m12-cplr
(-cprl on sc2) at end of BM and sc1,3,4 power off at L=6 i/b |
12.06.05 |
11:15 |
762 |
264 |
12.06.05 |
12:55 |
At L=6 sc 2,3,4 power on into
88m28-72m12-cplr (-cprl on sc2) |
|
|
763 |
265 |
|
|
Firings
on sc1 |
|
|
763 |
265 |
|
16:12 |
Sc1 powers on into 88m28-72m12-cplr
after firings |
|
|
763 |
265 |
|
21:45 |
At
end of o/b cusp / M+, which ever is later, all change to 88h58-72m12-cplr
(-cprl on sc2), MCPs at gain of as close
to 0.5 as possible |
|
|
763 |
265 |
|
14:45 |
Sc
2,3,4 power off at M- o/b (sc2 time shown) |
|
|
763 |
265 |
13.06.05 |
17:22 |
Sc1
changes to, and sc3 powers on into, 88m28-72m12-cplxt-apl-64w12, sc
2,4 power on into 88m28-72m12-cplxy-apl-nw-aph-nw; MCPs at gain of
as close to 0.5 as possible for BM in sheath |
|
|
763 |
265 |
|
21:04 |
Sc1 changes back to 88h58-72m12-cplr,
others power off at end of BM |
|
|
763 |
265 |
|
21:51 |
Sc1 powers off for firings |
|
|
763 |
265 |
|
|
Firings
on sc1,2,4 |
|
|
763 |
265 |
14.06.05 |
13:29 |
All power on at various times
into 88m28-72m12-cplr (-cprl on sc2) after firings and all power off
at L=6 |
14.06.05 |
22:05 |
763 |
265 |
14.06.05 |
23:35 |
At L=6 all power on into 88m28-72m12-cplr
(-cprl on sc2) |
|
|
764 |
265 |
15.06.05 |
00:35 |
At
end of o/b cusp sc2 changes to 88h58-72m12-cplr (-cprl on sc2),
MCPs at gain of as close to 0.5 as possible |
|
|
764 |
265 |
|
09:08 |
Sc1,3
change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw;
sc2 MCPs at gain of as close to 0.5 as possible for BM through
o/b MP |
|
|
764 |
265 |
|
09:15 |
At
end of o/b cusp sc 1,3,4 MCPs are lowered to gain
of as close to 0.5 as possible |
|
|
764 |
265 |
|
11:38 |
Sc 1,3,4 change to 88h58-72m12-cplr,
sc2 powers off at end of BM |
|
|
764 |
265 |
|
12:25 |
Sc
3,4 power off at M- o/b (sc3 time shown) |
|
|
764 |
265 |
|
15:25 |
Sc1 powers off for firings |
|
|
764 |
265 |
|
|
Firings
on all sc |
|
|
764 |
265 |
16.06.05 |
09:20 |
Sc2 powers on into 88m28-72m12-cprl,
MCPs at operational; sc1 powers on into 88h58-72m12-cplr,
MCPs at gain of as close to 0.5 as possible after firings |
|
|
764 |
265 |
|
12:00 |
Sc
3,4 power on into 88h58-72m12-cplr, MCPs at gain of as close to 0.5
as possible (sc3 time shown) |
|
|
764 |
265 |
|
14:44 |
Sc1,3
change to 88m28-72m12-cplxt-apl-64w12; sc2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw,
MCPs at gain of as close to 0.5 as possible on all but sc2 for
BM through i/b MP |
|
|
764 |
265 |
|
16:15 |
At
start of i/b cusp sc1,3,4 MCPs are raised back up to operational |
|
|
764 |
265 |
|
17:14 |
At end of BM all change to 88m28-72m12-cplr
(-cprl on sc2) |
|
|
764 |
265 |
17.06.05 |
05:34 |
MCP
op level test performed, sensors in 68h38-68h38, performed 4hrs 31 mins
before L=6 - sc1,3 use sc1 time, sc 2 and 4 use their own times
|
|
|
764 |
265 |
|
06:05 |
All change back to 88m28-72m12-cplr
(-cprl on sc2) at end of test and all
power off at L=6 |
17.06.05 |
10:05 |
764 |
265 |
17.06.05 |
04:25 |
At L=6 sc2 powers on into 88m28-72m12-cplr
(-cprl on sc2) |
|
|
765 |
265 |
|
11:45 |
Sc1,3
power on into 88m28-68m08-cplxs-aph-80w28, sc2 changes to 88m28-68m08-cplxy-apl-nw-aph-nw
at start of BM through auroral zone (and L=6) |
|
|
765 |
265 |
|
12:30 |
Sc4
powers on into 88m28-68m08-cplxy-apl-nw-aph-nw at L=6 |
|
|
765 |
265 |
|
13:15 |
At end of BM all change to 88m28-72m12-cplr
(-cprl on sc2) |
|
|
765 |
265 |
|
21:05 |
At
end of o/b cusp all change to 88h58-72m12-cplr (-cprl on sc2),
MCPs at gain of as close to 0.5 as possible |
|
|
765 |
265 |
|
17:00 |
Sc
2,3,4 power off at M- o/b (sc2 time shown) |
|
|
765 |
265 |
18.06.05 |
04:45 |
Sc1 powers off for firings |
|
|
765 |
265 |
|
|
Firings
on all sc |
|
|
765 |
265 |
|
14:36 |
Sc1 powers on into 88h58-72m12-cplr
after firings |
|
|
765 |
265 |
|
18:30 |
At
M- sc 2,3,4 power on into 88h58-72m12-cplr, MCPs at gain of as close to 0.5
as possible (sc2 time shown) |
|
|
765 |
265 |
19.06.05 |
02:50 |
All change to 88m28-72m12-cplr
(-cprl on sc2) and MCPs are returned to operational
levels at start of i/b cusp |
|
|
765 |
265 |
|
16:20 |
Sc2 powers off at L=6 i/b |
|
|
765 |
265 |
|
17:50 |
Sc2 powers on into 88m28-72m12-cprl
at L=6 o/b, orbit 766 |
|
|
766 |
265 |
|
20:12 |
Sc1,3
change to 88m28-68m08-cplxs-aph-80w28, sc 2,4 change to 88m28-68m08-cplxy-apl-nw-aph-nw
for BM through auroral zones |
|
|
765 |
265 |
|
21:05 |
Sc1 powers off at L=6 |
|
|
765 |
265 |
|
21:54 |
Sc 2,4 change back to 88m28-72m12-cplr,
sc3 powers off at end of BM |
|
|
765 |
265 |
|
22:25 |
Sc4 powers off at L=6 |
|
|
765 |
265 |
|
22:45 |
Sc1 powers on into 88m28-72m12-cplr
at L=6 o/b, orbit 766 |
|
|
766 |
265 |
19.06.05 |
23:20 |
At L=6 sc 3,4 power on into
88m28-72m12-cplr |
|
|
766 |
266 |
20.06.05 |
04:45 |
All power off for firings |
|
|
766 |
266 |
|
|
Firings
on all sc |
|
|
766 |
266 |
|
15:35 |
Sc2 powers on into to
88h58-72m12-cprl, MCPs at gain of
as close to 0.5 as possible |
|
|
766 |
266 |
|
23:00 |
Sc1,3
power on into 88m28-72m12-cplxt-apl-64w12, sc4 powers on into, and sc2
changes to 88m28-72m12-cplxy-apl-nw-aph-nw at start of BM in sheath |
|
|
766 |
266 |
21.06.05 |
02:06 |
At end of BM sc2 changes back
to 88m28-72m12-cprl; sc 1,3,4 power off |
|
|
766 |
266 |
|
09:10 |
At
M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs at gain of as close to 0.5
as possible |
|
|
766 |
266 |
|
13:10 |
All change to 88m28-72m12-cplr
(-cprl on sc2) and MCPs are returned to operational
levels at start of i/b cusp |
|
|
766 |
266 |
22.06.05 |
04:34 |
MCP
op level test performed, sensors in 68h38-68h38, performed 4hrs 31 mins
before L=6 - different times on all sc |
|
|
766 |
266 |
|
05:05 |
All change back to 88m28-72m12-cplr
(-cprl on sc2) at end of test and all
power off at L=6 |
22.06.05 |
09:05 |
766 |
266 |
22.06.05 |
10:45 |
At L=6 all power on into 88m28-72m12-cplr
(-cprl on sc2) |
|
|
767 |
266 |
|
21:00 |
At
end of o/b cusp sc2 changes to 88h58-72m12-cplr (-cprl on sc2),
MCPs at gain of as close to 0.5 as possible |
|
|
767 |
266 |
|
23:19 |
Sc1,3
change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw;
sc2 MCPs at gain of as close to 0.5 as possible for BM through
o/b MP |
|
|
767 |
266 |
23.06.05 |
01:28 |
Sc 2,3,4 change to 88h58-72m12-cplr
(-cprl on sc2), sc1 powers off at end of BM |
|
|
767 |
266 |
|
04:25 |
At
M- o/b sc 3,4 power off |
|
|
767 |
266 |
|
18:30 |
At
M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs at gain of as close to 0.5
as possible |
|
|
767 |
266 |
|
23:20 |
All change to 88m28-72m12-cplr
(-cprl on sc2) and MCPs are returned to operational
levels at start of i/b cusp |
|
|
767 |
266 |
24.06.05 |
17:40 |
All power off for firings |
|
|
767 |
266 |
|
|
Firings
on all sc |
|
|
|
|
25.06.05 |
06:06 |
At end of firings all power
on into 88h58-72m12-cplr (-cprl on
sc2), MCPs at gain of as close to 0.5 as
possible |
|
|
768 |
267 |
|
20:54 |
Sc1,3
change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw;
MCPs at gain of as close to 0.5 as possible for BM through sheath |
|
|
768 |
267 |
|
23:12 |
All change back to 88h58-72m12-cplr
(-cprl on sc2) at end of BM |
|
|
768 |
267 |
26.06.05 |
06:00 |
Sc1,3
change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw;
sc2 MCPs at gain of as close to 0.5 as possible for BM through
i/b MP |
|
|
768 |
267 |
|
06:48 |
All change back to 88h58-72m12-cplr
(-cprl on sc2) at end of BM |
|
|
768 |
267 |
27.06.05 |
00:59 |
MCP
op level test performed, sensors in 68h38-68h38, performed 4hrs 31 mins
before L=6 - sc1: 00:59, sc2: 23:59, sc 3,4: 03:14 |
|
|
768 |
267 |
|
01:30 |
All change to 88m28-72m12-cplr
(-cprl on sc2), MCPs at operational levels
at end of test and all power off at L=6 |
27.06.05 |
05:30 |
768 |
267 |
27.06.05 |
07:20 |
At L=6 all power on into 88m28-72m12-cplr
(-cprl on sc2) |
|
|
769 |
267 |
|
09:10 |
At
end of o/b cusp all change to 88h58-72m12-cplr (-cprl on sc2),
and MCPs are set to a gain of as close to 0.5 as possible |
|
|
769 |
267 |
28.06.05 |
14:00 |
Sc1,3
change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw;
MCPs at gain of as close to 0.5 as possible for BM through i/b
MP |
|
|
769 |
267 |
|
18:00 |
All change back to 88h58-72m12-cplr
(-cprl on sc2) at end of BM |
|
|
769 |
267 |
|
12:05 |
Sc 1,2 change to 88m28-72m12-cplr
(-cprl on sc2) and MCPs are returned to operational levels at start of i/b
cusp |
|
|
769 |
267 |
29.06.05 |
12:20 |
All power off for firings |
|
|
769 |
267 |
|
|
Firings
on all sc |
|
|
|
|
30.06.05 |
03:16 |
At end of firings all power
on into 88h58-72m12-cplr (-cprl on
sc2), MCPs at gain of as close to 0.5 as
possible |
|
|
770 |
267 |
|
04:40 |
All power off for firings |
|
|
770 |
267 |
|
|
Firings
on all sc |
|
|
|
|
|
17:06 |
At end of firings all power
on into 88h58-72m12-cplr (-cprl on
sc2), MCPs at gain of as close to 0.5 as
possible |
|
|
770 |
267 |
|
18:18 |
All power off for firings |
|
|
770 |
267 |
|
|
Firings
on all sc |
|
|
|
|
01.07.05 |
06:23 |
At end of firings all power
on into 88h58-72m12-cplr (-cprl on
sc2), MCPs at gain of as close to 0.5 as
possible |
|
|
770 |
267 |
|
07:55 |
All power off for firings |
|
|
770 |
267 |
|
|
Firings
on all sc |
|
|
|
|
|
19:41 |
At end of firings sc 1,2 power
on into 88m28-72m12-cplr (-cprl on
sc2), MCPs at operational levels; sc
3,4 power on into 88h58-72m12-cplr, MCPs at gain of as close to 0.5 as possible |
|
|
770 |
267 |
|
21:20 |
Sc1,3
change to 88m28-68m08-cplxs-aph-80w28, sc 2,4 change to 88m28-68m08-cplxy-apl-nw-aph-nw;
MCPs on sc 3,4 raised back up to operational for BM through
i/b auroral zone |
|
|
770 |
267 |
|
23:20 |
Sc 1,2 power off at L=6 i/b |
|
|
770 |
267 |
|
23:55 |
Sc 3,4 change to 88m28-72m12-cplr
at end of BM |
|
|
770 |
267 |
02.07.05 |
00:00 |
At L=6 sc2 powers on into 88m28-72m12-cprl |
|
|
771 |
267 |