Power on
/ Start |
Mode |
Power off |
Orbit
# |
Planning
period |
||
date |
time |
date |
time |
|||
27.02.06 |
09:25 |
At L=6 o/b sc 1,2,3 power on into, and sc4 changes to, 88m28-72m12-cplr; sc4 MCPs are also raised back up to operational | 872 |
302 |
||
11:30 |
At end of WBD ops sc4 power cycles to 88m28-72m12-cplr | 872 |
302 |
|||
16:35 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 872 |
302 |
|||
18:05 |
At M- o/b + 1 hour sc 2,3,4 power off | 872 |
302 |
|||
20:00 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 872 |
302 |
|||
21:50 |
At B- o/b sc 2,3,4 power off | 872 |
302 |
|||
28.02.06 |
05:15 |
5 mins before start of eclipse sc1 changes to off-60m00-cpls, LEEA MCP lowered by one level, with internal sunpulse | 872 |
302 |
||
06:04 |
5 mins after end of eclipse sc1 changes back to off-76m16-cpls, LEEA MCP lowered by one level, with external sunpulse | 872 |
302 |
|||
01.03.06 |
04:10 |
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 872 |
302 |
||
05:45 |
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off | 872 |
302 |
|||
09:05 |
At M- i/b sc2 powers on into 88h58-72m12-cplr, MCPs lowered by one level | 872 |
302 |
|||
09:20 |
At start of BM sc1 changes to, and sc3 powers on into, 88h58-72m12-cplxt-apl-64w12; sc2 changes to, and sc4 powers on into 88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one levelon all, for BM through MP | 872 |
302 |
|||
11:20 |
At end of BM sc 1,2,3 change to 88m28-72m12-cplr and MCPs are raised back up to operational, sc4 changes back to 88h58-72m12-cplr | 872 |
302 |
|||
11:55 |
At M+ i/b sc4 changes to 88m28-72m12-cplr and MCPs are raised back up to operational, and all power off at L=6 | 872 |
302 |
|||
01.03.06 |
19:00 |
At L=6 o/b all power on into 88m28-72m12-cplr | 873 |
302 |
||
02.03.06 |
01:40 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 873 |
302 |
||
03:40 |
At M- o/b + 1 hour sc 2,3,4 power off | 873 |
302 |
|||
05:00 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 873 |
302 |
|||
03.03.06 |
13:10 |
Sc1 changes to, and sc3 powers on into, off-72m12-cpxy-apl-64w12-tnl-nw, sc2,4 power on into off-72m12-cplx-anl-nw for BM through i/b BS | 873 |
302 |
||
15:40 |
At end of BM sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off | 873 |
302 |
|||
13:15 |
At M- i/b sc 2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 873 |
302 |
|||
19:50 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and all power off at L=6 | 04.03.06 |
02:05 |
873 |
302 |
|
04.03.06 |
03:25 |
At L=6 o/b sc2 powers on into 88m28-72m12-cplr | 874 |
302 |
||
04.03.06 |
03:40 |
At L=6 o/b sc 1,3,4 power on into 88m28-72m12-cplr | 874 |
303 |
||
10:50 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 874 |
303 |
|||
11:00 |
At start of BM sc1,3 change to 88h58-72m12-cplxt-apl-64w12; sc2,4 change to 88h58-72m12-cplxy-apl-nw-aph-nw for BM through o/b MP | 874 |
303 |
|||
12:30 |
At end of BM all change back to 88h58-72m12-cplr | 874 |
303 |
|||
12:45 |
At M- o/b + 1 hour sc 1,3,4 power off | 874 |
303 |
|||
14:05 |
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 874 |
303 |
|||
15:55 |
At B- o/b sc 1,3,4 power off | 874 |
303 |
|||
05.03.06 |
22:20 |
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 874 |
303 |
||
23:55 |
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off | 874 |
303 |
|||
06.03.06 |
03:25 |
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 874 |
303 |
||
04:50 |
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational | 874 |
303 |
|||
07:44 |
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 07:44; sc4 at 09:14 | 874 |
303
|
|||
08:15 |
At end of test all change to 88m28-72m12-cplr (-cprl on sc2) | 874 |
303 |
|||
11:15 |
At L=6 i/b sc3,4 power off; sc1,2 change to 88m28-68m08-cplr, MCPs lowered by one level, for WBD ops | 874 |
303 |
|||
11:48 |
5 mins before start of eclipse sc1,2 change to 88m28-60m00-cplr, MCPs lowered by one level, with internal sunpulse | 874 |
303 |
|||
06.03.06 |
12:58 |
5 mins after end of eclipse (after end of WBD ops) sc1,2 change back to external sunpulse and power off | 874 |
303 |
||
06.03.06 |
13:05 |
At L=6 o/b all power on into 88m28-72m12-cplr | 875 |
303 |
||
19:50 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 875 |
303 |
|||
21:40 |
At M- o/b + 1 hour sc 1,3,4 power off | 875 |
303 |
|||
23:10 |
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 875 |
303 |
|||
07.03.06 |
01:00 |
At B- o/b sc 1,3,4 power off | 875 |
303 |
||
19:50 |
At start of BM sc 1,3 power on into off-72m12-cpxy-apl-64w12-tnl-nw; sc2 changes to, and sc4 powers on into, off-72m12-cplx-anl-nw, LEEA MCP lowered by one level for BM in i/b wind | 875 |
303 |
|||
22:50 |
At end of BM sc2 changes back to off-76m16-cpls; sc 1,3,4 power off | 875 |
303 |
|||
08.03.06 |
07:25 |
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 875 |
303 |
||
08:55 |
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off | 875 |
303 |
|||
12:30 |
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 875 |
303 |
|||
13:55 |
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational | 875 |
303 |
|||
20:30 |
At L=6 i/b sc1,2,3 power off; sc4 changes to 88m28-68m08-cplr, MCPs lowered by one level, for WBD ops | 875 |
303 |
|||
22:10 |
5 mins before start of eclipse sc4 changes to 88m28-60m00-cplr, MCPs lowered by one level, with internal sunpulse | 875 |
303 |
|||
23:06 |
5 mins after end of eclipse (after end of WBD ops) sc4 changes back to external sunpulse and powers off | 875 |
303 |
|||
08.03.06 |
22:10 |
At L=6 o/b all power on into 88m28-72m12-cplr | 876 |
303 |
||
09.03.06 |
03:15 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 876 |
303 |
||
06:45 |
At M- o/b + 1 hour sc 1,3,4 power off | 876 |
303 |
|||
08:05 |
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 876 |
303 |
|||
10:00 |
At B- o/b sc 1,3,4 power off | 876 |
303 |
|||
10.03.06 |
16:25 |
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 876 |
303 |
||
18:00 |
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off | 876 |
303 |
|||
21:35 |
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 876 |
303 |
|||
23:00 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational and all power off at L=6 | 11.03.06 |
05:15 |
876 |
303 |
|
11.03.06 |
06:55 |
At L=6 o/b sc 1,2 power on into 88m28-72m12-cplr | 877 |
303 |
||
11.03.06 |
07:05 |
At L=6 o/b sc 3,4 power on into 88m28-72m12-cplr | 877 |
304 |
||
06:55 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 877 |
304 |
|||
15:40 |
At M- o/b + 1 hour sc 2,3,4 power off | 877 |
304 |
|||
17:10 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 877 |
304 |
|||
18:50 |
At B- o/b sc 2,3,4 power off | 877 |
304 |
|||
13.03.06 |
01:20 |
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 877 |
304 |
||
03:00 |
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off | 877 |
304 |
|||
06:25 |
At M- i/b sc2,3 power on into 88h58-72m12-cplr, MCPs lowered by one level | 877 |
304 |
|||
06:55 |
At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12, sc2 changes to, and sc4 powers on into, 88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one level on all for BM through i/b MP | 877 |
304 |
|||
08:25 |
At end of BM sc 1,2,3 change back to 88m28-72m12-cplr and MCPs are raised back up to operational; sc4 changes back to 88h58-72m12-cplr | 877 |
304 |
|||
09:10 |
At M+ i/b sc4 changes to 88m28-72m12-cplr and MCPs are raised back up to operational | 877 |
304 |
|||
11:19 |
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 11:19; sc4 at 12:39 | 877 |
304 |
|||
11:50 |
At end of test all change to 88m28-72m12-cplr (-cprl on sc2) | 877 |
304 |
|||
14:50 |
At L=6 i/b sc1,2,3 power off; sc4 changes to 88m28-68m08-cplr, MCPs lowered by one level, for WBD ops | 877 |
304 |
|||
16:21 |
5 mins before start of eclipse sc4 changes to 88m28-60m00-cplr, MCPs lowered by one level, with internal sunpulse | 877 |
304 |
|||
17:16 |
5 mins after end of eclipse (after end of WBD ops) sc4 changes back to external sunpulse and powers off | 877 |
304 |
|||
13.03.06 |
16:35 |
At L=6 o/b all power on into 88m28-72m12-cplr | 878 |
304 |
||
23:10 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 878 |
304 |
|||
14.03.06 |
00:50 |
At M- o/b + 1 hour sc 2,3,4 power off | 878 |
304 |
||
02:15 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 878 |
304 |
|||
15.03.06 |
09:55 |
At start of BM sc 1,3 change to off-72m12-cpxy-apl-64w12-tnl-nw; sc2,4 to off-72m12-cplx-anl-nw, LEEA MCP lowered by one level for BM in i/b wind | 878 |
304 |
||
12:55 |
At end of BM sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off | 878 |
304 |
|||
15:30 |
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 878 |
304 |
|||
17:05 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational and all power off at L=6 | 15.03.06 |
23:45 |
878 |
304 |
|
16.03.06 |
01:20 |
At L=6 o/b all power on into 88m28-72m12-cplr | 879 |
304 |
||
06:15 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 879 |
304 |
|||
08:50 |
At M- o/b + 1 hour sc 2,3,4 power off | 879 |
304 |
|||
11:20 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 879 |
304 |
|||
13:15 |
At B- o/b sc 2,3,4 power off | 879 |
304 |
|||
17.03.06 |
19:30 |
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 879 |
304 |
||
21:05 |
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off | 879 |
304 |
|||
18.03.06 |
00:45 |
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 879 |
304 |
||
02:10 |
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational | 879 |
304 |
|||
08:45 |
At L=6 i/b sc3 powers off; sc1,2,4 change to 88m28-68m08-cplr, MCPs lowered by one level, for WBD ops | 879 |
304 |
|||
09:13 |
5 mins before start of eclipse sc1,2 change to 88m28-60m00-cplr, MCPs lowered by one level, with internal sunpulse | 879 |
304 |
|||
10:07 |
5 mins after end of eclipse sc1,2 change back to 88m28-68m08-cplr, MCPs lowered by one level, with external sunpulse | 879 |
304 |
|||
18.03.06 |
10:25 |
At L=6 o/b sc2 changes to 88m28-72m12-cplr and MCPs are raised back up to operational | 880 |
304 |
||
10:39 |
5 mins before start of eclipse sc4 changes to 88m28-60m00-cplr, MCPs lowered by one level, with internal sunpulse | 880 |
305 |
|||
11:18 |
5 mins after end of eclipse sc4 changes back to external sunpulse and powers off | 880 |
305 |
|||
18.03.06 |
10:35 |
At L=6 o/b sc1 changes to, and sc 3,4 power on into, 88m28-72m12-cplr; sc1 MCPs are also raised back up to operational | 880 |
305 |
||
11:00 |
At end of WBD ops sc 1,2 power cycle to 88m28-72m12-cplr | 880 |
305 |
|||
17:20 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 880 |
305 |
|||
09:15 |
At M- o/b + 1 hour sc 1,3,4 power off | 880 |
305 |
|||
20:25 |
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 880 |
305 |
|||
22:20 |
At B- o/b sc 1,3,4 power off | 880 |
305 |
|||
19.03.06 |
20:30 |
At start of BM sc2 power cycles to, and sc4 powers on into off-72m12-cplx-anl-nw, and sc 1,3 power on into off-72m12-cpxy-apl-64w12-tnl-nw, LEEA MCP lowered by one level for BM in wind | 880 |
305 |
||
23:30 |
At end of BM sc2 changes back to off-76m16-cplr, MCPs lowered by one level; sc 1,3,4 power off | 880 |
305 |
|||
20.03.06 |
04:25 |
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 15.03.06 |
23:45 |
880 |
305 |
05:55 |
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off | 880 |
305 |
|||
09:40 |
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 880 |
305 |
|||
11:05 |
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational | 880 |
305 |
|||
14:39 |
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 14:39; sc4 at 15:54 | 880 |
305 |
|||
15:10 |
At end of test all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6 i/b | 20.03.06 |
18:10 |
880 |
305 |
|
20.03.06 |
19:50 |
At L=6 o/b all power on into 88m28-72m12-cplr | 881 |
305 |
||
21.03.06 |
01:10 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 881 |
305 |
||
02:00 |
At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12; sc2,4 to 88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one level on all for BM through o/b MP | 881 |
305 |
|||
03:30 |
At end of BM all change back to 88h58-72m12-cplr | 881 |
305 |
|||
04:20 |
At M- o/b + 1 hour sc 1,3,4 power off | 881 |
305 |
|||
05:30 |
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 881 |
305 |
|||
07:25 |
At B- o/b sc 1,3,4 power off | 881 |
305 |
|||
22.03.06 |
13:25 |
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 881 |
305 |
||
15:00 |
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off | 881 |
305 |
|||
18:45 |
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 881 |
305 |
|||
20:15 |
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational | 881 |
305 |
|||
23.03.06 |
02:50 |
At L=6 i/b sc1,2,3 power off; sc4 changes to 88m28-68m08-cplr, MCPs lowered by one level, for WBD ops | 881 |
305 |
||
04:26 |
5 mins before start of eclipse sc4 changes to 88m28-60m00-cplr, MCPs lowered by one level, with internal sunpulse | 881 |
305 |
|||
05:25 |
At end of WBD ops (7 mins after end of eclipse) sc4 changes back to external sunpulse and powers off | 881 |
305 |
|||
23.03.06 |
04:30 |
At L=6 o/b all power on into 88m28-72m12-cplr | 882 |
305 |
||
11:30 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 882 |
305 |
|||
13:25 |
At M- o/b + 1 hour sc 1,3,4 power off | 882 |
305 |
|||
14:35 |
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 882 |
305 |
|||
16:30 |
At B- o/b sc 1,3,4 power off | 882 |
305 |
|||
24.03.06 |
22:15 |
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 882 |
305 |
||
23:50 |
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off | 882 |
305 |
|||
25.03.06 |
03:50 |
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 882 |
305 |
||
05:15 |
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational | 882 |
305 |
|||
12:20 |
At L=6 i/b sc1,2,3 power off; sc4 changes to 88m28-68m08-cplr, MCPs lowered by one level, for WBD ops | 882 |
305 |
|||
14:48 |
Sc4 powers off at end of WBD ops | 882 |
306 |
|||
25.03.06 |
14:05 |
At L=6 o/b all power on into 88m28-72m12-cplr | 883 |
306 |
||
18:15 |
At start of BM sc 1,3 change to 88m28-72m12-cplxt-apl-64w12; sc2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b cusp | 883 |
306 |
|||
19:45 |
At end of BM all change back to 88m28-72m12-cplr | 883 |
306 |
|||
20:40 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 883 |
306 |
|||
22:35 |
At M- o/b + 1 hour sc 2,3,4 power off | 883 |
306 |
|||
23:35 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 883 |
306 |
|||
26.03.06 |
01:35 |
At B- o/b sc 2,3,4 power off | 883 |
306 |
||
27.03.06 |
07:20 |
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 883 |
306 |
||
08:55 |
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off | 883 |
306 |
|||
12:50 |
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 883 |
306 |
|||
14:20 |
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational | 883 |
306 |
|||
17:54 |
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 11:19; sc4 at 12:39 | 883 |
306 |
|||
18:25 |
At end of test all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6 i/b | 27.03.06 |
21:25 |
883 |
306 |
|
27.03.06 |
23:00 |
At L=6 o/b all power on into 88m28-72m12-cplr | 884 |
306 |
||
28.03.06 |
03:35 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 884 |
306 |
||
07:40 |
At M- o/b + 1 hour sc 2,3,4 power off | 884 |
306 |
|||
08:50 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 884 |
306 |
|||
10:50 |
At B- o/b sc 2,3,4 power off | 884 |
306 |
|||
29.03.06 |
16:15 |
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 884 |
306 |
||
17:55 |
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off | 884 |
306 |
|||
21:50 |
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 884 |
306 |
|||
23:20 |
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational and all power off at L=6 i/b | 30.03.06 |
06:15 |
884 |
306 |
|
30.03.06 |
08:05 |
At L=6 o/b all power on into 88m28-72m12-cplr | 885 |
306 |
||
14:55 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level | 885 |
306 |
|||
16:50 |
At M- o/b + 1 hour sc 2,3,4 power off | 885 |
306 |
|||
17:55 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level | 885 |
306 |
|||
01.04.06 |
00:40 |
At start of BM sc 1,3 change to off-72m12-cpxy-apl-64w12-tnl-nw; sc2,4 to off-72m12-cplx-anl-nw, LEEA MCP lowered by one level for BM in i/b wind | 885 |
306 |
||
03:40 |
At end of BM sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off | 885 |
306 |
|||
06:55 |
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level | 885 |
306 |
|||
08:25 |
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational and all power off at L=6 i/b | 01.04.06 |
15:50 |
885 |