Apr 2001 Sc1 Calendar sc2 sc3 sc4
Jun 2001

Power on / Start

Mode

Power off

Orbit #

Planning period

date

time

date

time

01.05.01

09:06

Nominal science

   

131

050

 

22:15

Mode 60m00-60m00-ctl for solar wind

   

131

050

02.05.01

19:00

Nominal science

03.05.01

14:05

131

050

   

CTU reboot on sc 1, 4 and 3 Only spacecraft 2 running

       

04.05.01

 

Spacecraft 1 and 4 successfully powered back on and off again, sc3 powered on but no commands sent

       

05.05.01

09:37

Spacecraft 2 only: Mode 88m28-60m00-cplxt-apl-60w08

05.05.01

21:24

132

051

08.05.01

 

Spacecraft 3 successfully powered back on and off again

       

08.05.01

22:20

Spacecraft 2 only: Nominal science

09.05.01

01:07

132

051

   

Planning period 52 not run on any spacecraft

       

10.05.01

 

Manoeuvres on spacecraft 1,3,4. Start of change to 2000km separation

       

13.05.01

 

Manoeuvres on spacecraft 2,3

       

16.05.01

 

Manoeuvres on spacecraft 1

       

17.05.01

 

Manoeuvres on spacecraft 2,3

       

17.05.01

Various

Nominal science (sc 1 and 4), spacecraft power on times vary due to previous manoeuvres and perigee

   

138

053

18.05.01

13:30

All spacecraft into solar wind mode 60m00-60m00-ctl

19.05.01

17:49

138

053

20.05.01

 

Manoeuvres on spacecraft 1 and 4

21.05.01

     

21.05.01

03:57

Spacecraft 2 and 3 into mode 60m00-60m00-cptl

21.05.01

15:44

139

053

21.05.01

 

Manoeuvres on spacecraft 2 and 3

22.05.01

     

23.05.01

06:01

Mode 60m00-60m00-cptl on all spacecraft

24.05.01

04:55

140

053

25.05.01

 

Manoeuvres on all spacecraft

       
   

MCP LEVELS RAISED ON ALL INSTRUMENTS EXCEPT LEEAS ON SC 1 AND 4 (HEEAS RAISED BY 2 LEVELS, LEEAS BY 1)

       

25.05.01

Various

Mode 60m00-60m00-cptl on all spacecraft for possible bow shock skimming. Spacecraft power on times vary due to previous manoeuvres

26.05.01

13:21

141

054

27.05.01

05:35

Nominal science (perigee at end)

27.05.01

08:46

141

054

27.05.01

10:51

Nominal science (perigee at start)

   

142

054

 

15:30

MCP Operational level test (sensors in 68h38-68h38 for magnetosphere)

   

142

054

 

16:00

Back to nominal science

   

142

054

 

21:00

MCP Operational level test (sensors in 50h20-50h20 for magnetosheath)

   

142

054

 

21:30

Back to nominal science

   

142

054

28.05.01

03:00

Mode 60m00-60m00-cptl for possible bow shock skimming

   

142

054

 

17:00

Back to nominal science

   

142

054

29.05.01

02:00

Mode 80m20-80m20-clf for calibration (perigee at end)

29.05.01

17:39

142

054

29.05.01

 

Manoeuvres on all spacecraft

       

30.05.01

Various

Nominal science, spacecraft power on times vary due to previous manoeuvres

31.05.01

10:12

143

054

   

IEL TO EDI OPENED ON ALL SPACECRAFT