Oct 2003 Sc1 Calendar sc2 sc3 sc4
Dec 2003

Power on / Start

Mode

Power off

Orbit #

Planning period

date

time

date

time

01.11.03

00:00

All power on into 88m28-72m12-cplr (-cprl on sc2) at L=6

   

515

181

 

02:00

All change to 88m28-66h36-cplr (-cprl on sc2) 2 hours after L=6

   

515

181

 

17:40

Sc 1,3 change to 88m28-66h36-cplxs-aph-80w28, sc 2,4 to 88m28-66h36-cplxy-apl-nw-aph-nw for BM through (possible) NS

   

515

181

 

20:40

All back to 88m28-66h36-cplr (-cprl on sc2) at end of BM

   

515

181

02.11.03

21:00

MCP operational level test, sensors in 68h38-68h38.  LEEA 3 grid left on for first time during a test

   

515

181

 

21:40

All back to 88m28-66h36-cplr (-cprl on sc2) at end of test

   

515

181

03.11.03

05:15

All change to 88m28-72m12-cplr (-cprl on sc2) 2 hours before L=6 and all power off at L=6

03.11.03

07:15

515

181

   

Note:  sc2 in NM3 on orbit 516

     

181

03.11.03

08:50

Sc 1,2 on in 88m28-72m12-cplr, sc 3,4 into 88m28-68m08-cplr for ASPOC ops

   

516

181

 

10:50

Sc 1,2 change to 88m28-66h36-cplr 2 hours after L=6

   

516

181

 

15:50

Sc 3,4 change to 88m28-66h36-cplr at end of ASPOC ops

   

516

181

04.11.03

09:33

Sc 3,4 change to 88m28-72m12-cplr for ASPOC ops centred on BM ops at apogee

   

516

181

 

12:18

Sc 1 changes to 88m28-66h36-cplxs-aph-80w28; sc 2 to 88m28-66h36-cplxy-apl-nw-aph-nw; sc3 to 88m28-68m08-cplxs-aph-80w28 and sc4 to 88m28-68m08-cplxy-apl-nw-aph-nw for BM at apogee

   

516

181

 

13:48

At end of BM, sc 1,2 change back to 88m28-66h36-cplr, sc 3,4 to 88m28-72m12-cplr

   

516

181

 

16:33

Sc 3,4 change back to 88m28-66h36-cplr when ASPOC power off

   

516

181

05.11.03

09:10

Sc 3,4 change to 88m28-68m08-cplr for ASPOC ops

   

516

181

 

14:10

Sc 1,2 change to 88m28-72m12-cplr (-cprl on sc2) 2 hours before L=6

   

516

181

 

16:00

Sc3 powers off 10 mins before L=6

   

516

181

 

16:10

At L=6, sc 1,4 power off, sc 3 powers back on into single sensor ops mode off-68m08-cpls and sc2 changes to 88m28-68m08-cpx-aph-88w60 for perigee pass with WBD ops

   

516

181

05.11.03

17:55

Sc 1,4 power on into 88m28-72m12-cplr, sc 2 changes to 88m28-72m12-cprl, sc 3 HEEA powers on and instrument changes to 88m28-72m12-cplr

   

517

181

 

19:50

Sc 2,3 power off for 10 min power cycle after perigee ops

   

517

181

 

20:00

Sc 2,3 power on into, and sc 1,4 change to 88m28-66h36-cplr (-cprl on sc2) 2 hours after L=6

   

517

181

06.11.03

23:00

Sc 2 changes to 88m28-72m12-cprl for possible MP skimming/sheath ops

   

517

181

07.11.03

16:00

Sc 2 changes back to 88m28-66h36-cprl

   

517

181

 

23:40

All change to 88m28-72m12-cplr (-cprl on sc2) 2 hours before L=6 and all power off at L=6

07.11.03

01:40

517

181

08.11.03

03:15

Sc 1,3 on in 88m28-68m08-cplxt-apl-60w08, sc 2,4 on in 88m28-68m08-cplxy-apl-nw-aph-nw for BM through auroral zone

   

518

182

 

05:05

Sc 1,2 change to 88m28-66h36-cplr (-cprl on sc2), sc 3,4 to 88m28-68m08-cplr for ASPOC ops

   

518

182

 

10:15

Sc 3,4 change to 88m28-66h36-cplr at end of ASPOC ops

   

518

182

09.11.03

05:05

Sc 1,3 power off for sheath 1 hour before M+ O

   

518

182

 

11:20

Sc 4 changes to 88m28-72m12-cplr at o/b MP

   

518

182

 

21:30

Sc 4 changes back to 88m28-66h36-cplr at i/b MP

   

518

182

10.11.03

01:20

Sc 1,3 power on into 88m28-66h36-cplr 1 hour after M+ I

   

518

182

 

03:15

Sc 3,4 change to 88m28-68m08-cplr for ASPOC ops

   

518

182

 

08:15

Sc 1,2 change to 88m28-72m12-cplr (-cprl on sc2) 2 hours before L=6 and all power off at L=6

10.11.03

10:15

518

182

10.11.03

11:50

All power on into 88m28-72m12-cplr (-cprl on sc2)

   

519

182

 

13:50

All change to 88m28-66h36-cplr (-cprl on sc2) 2 hours after L=6

   

519

182

11.11.03

11:55

Sc 1,3 power off for sheath 1 hour before M+ O

   

519

182

 

15:55

Sc 2,4 change to 88m28-68m08-cplxy-apl-nw-aph-nw for BM centred on MP with ASPOC

   

519

182

 

18:55

Sc 2 changes back to 88m28-66h36-cprl, sc 4 changes back to 88m28-72m12-cplr at end of BM

   

519

182

12.11.03

08:00

Sc 4 changes back to 88m28-66h36-cprl at i/b MP

   

519

182

 

11:50

Sc 1,3 power on into 88m28-66h36-cplr 1 hour after M+ I

   

519

182

 

17:35

All change to 88m28-72m12-cplr (-cprl on sc2) 2 hours before L=6 i/b

   

519

182

 

19:25

Sc 3 powers off

   

519

182

 

19:35

Sc 1 changes to 88m28-68m08-cplr, sc 3 powers on into single sensor ops mode off-68m08-cpls, sc 2 changes to 88m28-68m08-cpx-aph-88w60, and sc 4 changes to 88m28-60m00-cpx-aph-88w60for perigee pass with WBD ops

   

519

182

 

20:49

All power off at end of WBD ops

   

519

182

   

Note:  sc2 in NM3 on orbit 520

     

182

12.11.03

21:20

Sc 1,2 on in 88m28-72m12-cplr, sc 3,4 into 88m28-68m08-cplr for ASPOC ops

   

520

182

 

23:20

Sc 1,2 change to 88m28-66h36-cplr 2 hours after L=6

   

520

182

13.11.03

04:25

Sc 3,4 change to 88m28-66h36-cplr at end of ASPOC ops

   

520

182

 

19:00

Sc 1,3 power off for sheath 1 hour before M+ O

   

520

182

 

23:30

Sc 4 changes to 88m28-72m12-cplr at o/b MP

   

520

182

14.11.03

17:55

Sc 4 changes back to 88m28-66h36-cplr at i/b MP

   

520

182

 

21:20

Sc 1 powers on into 88m28-66h36-cplr, sc 3 into 88m28-68m08-cplr 1 hour after M+ I

   

520

182

 

21:40

Sc 4 changes to 88m28-68m08-cplr for ASPOC ops

   

520

182

15.11.03

02:40

Sc 1,2 change to 88m28-72m12-cplr 2 hours before L=6 and all power off at L=6

15.11.03

04:40

520

182

15.11.03

06:13

Sc 1,3 on in 88m28-68m08-cplxt-apl-60w08, sc 2,4 on in 88m28-68m08-cplxy-apl-nw-aph-nw for BM through auroral zone

   

521

183

 

07:50

All change to 88m28-66h36-cplr (-cprl on sc2) at end of BM

   

521

183

 

09:25

MCP operational level test, sensors in 68h38-68h38

   

521

183

16.11.03

02:20

Sc 1,3 power off for sheath 1 hour before M+ O

   

521

183

 

06:25

Sc 4 changes to 88m28-72m12-cplr at o/b MP and sc 2,4 MCP levels dropped by 2

   

521

183

17.11.03

03:40

Sc 4 changes back to 88m28-66h36-cplr at i/b MP and sc 2,4 MCP levels raised back up to operational

   

521

183

 

06:45

Sc 1,3 power on into 88m28-66h36-cplr 1 hour after M+ I

   

521

183

 

11:25

All change to 88m28-72m12-cplr (-cprl on sc2) 2 hours before L=6

   

521

183

 

13:25

Sc 1 changes to 88m28-68m08-cplr, sc 3 powers off and on into single sensor ops mode off-68m08-cpls, sc 2 changes to 88m28-68m08-cpx-aph-88w60, and sc 4 changes to 88m28-60m00-cpx-aph-88w60 for perigee pass with WBD ops

   

521

183

 

15:10

At L=6 o/b, sc3 HEEA powers on and instrument changes to 88m28-68m08-cplr, sc 4 changes to same mode, and sc 1,2 change to 88m28-72m12-cplr (-cprl on sc2)

   

522

183

 

17:10

2 hours after L=6 all instruments power cycle, sc 1,2 powering on into 88m28-66h36-cplr (-cprl on sc2), sc 3,4 into 88m28-68m08-cplr

   

522

183

 

22:10

Sc 3,4 change to 88m28-66h36-cplr when ASPOC power off

   

522

183

18.11.03

09:55

Sc 1,3 power off for sheath 1 hour before M+ O

   

522

183

 

13:40

Sc 4 changes to 88m28-72m12-cplr at o/b MP and sc 2,4 MCP levels dropped by 2

   

522

183

 

18:41

Sc 2,4 change to 88m28-68m08-cplxy-apl-nw-aph-nw for BM at apogee

   

522

183

 

20:11

Sc 2 changes back to 88m28-66h36-cprl, sc 4 changes back to 88m28-72m12-cplr at end of BM

   

522

183

19.11.03

13:15

Sc 4 changes back to 88m28-66h36-cplr at i/b MP and sc 2,4 MCP levels raised back up to operational

   

522

183

 

16:00

Sc 4 changes to 88m28-68m08-cplr for ASPOC ops

   

522

183

 

16:10

Sc 1 powers on into 88m28-66h36-cplr, sc 3 into 88m28-68m08-cplr 1 hour after M+ I

   

522

183

 

21:00

Sc 1,2 change to 88m28-72m12-cplr 2 hours before L=6 and all power off at L=6

19.11.03

21:00

522

183

20.11.03

00:35

All power on into 88m28-72m12-cplr (-cprl on sc2)

   

523

183

 

02:40

All change to 88m28-66h36-cplr (-cprl on sc2) 2 hours after L=6

   

523

183

 

17:40

Sc 1,3 power off for sheath 1 hour before M+ O

   

523

183

 

19:35

Sc 2,4 change to 88m28-68m08-cplxy-apl-nw-aph-nw and MCP levels dropped by 2 for BM centred on MP

   

523

183

 

22:35

Sc 2 changes back to 88m28-66h36-cprl, sc 4 changes back to 88m28-72m12-cplr at end of BM

   

523

183

21.11.03

22:45

Sc 4 changes back to 88m28-66h36-cprl and sc 2,4 MCP levels raised back up to operational at i/b MP

   

523

183

22.11.03

01:25

Sc 1,3 power on into 88m28-66h36-cplr 1 hour after M+ I

   

523

183

 

05:45

All change to 88m28-72m12-cplr (-cprl on sc2) 2 hours before L=6 i/b and all power off at L=6

22.11.03

07:45

523

183

   

Note:  sc2 in NM3 on orbit 524

       

22.11.03

09:15

Sc 1,2 on in 88m28-72m12-cplr, sc 3,4 into 88m28-68m08-cplr for ASPOC ops

   

524

184

 

11:15

Sc 1,2 change to 88m28-66h36-cplr 2 hours after L=6

   

524

184

 

16:15

Sc 3,4 change to 88m28-66h36-cplr at end of ASPOC ops

   

524

184

23.11.03

02:30

Sc 2,3 power off; sc1 changes to 88h58-72m12-cplr and MCP levels dropped by 2 at M+ O

   

524

184

 

04:45

Sc4 powers off for sheath at MP o/b

   

524

184

24.11.03

08:05

Sc4 powers on into 88m28-66h36-cplr at MP i/b

   

524

184

 

09:40

At M+ I, sc2 powers on into 88m28-66h36-cplr, sc3 powers on into 88m28-68m08-cplr and sc1 changes to 88m28-66h36-cplr and its MCP levels are raised back to operational

   

524

184

 

09:50

Sc 4 changes to 88m28-68m08-cplr for ASPOC ops

   

524

184

 

14:50

Sc 1,2 change to 88m28-72m12-cplr 2 hours before L=6 and all power off at L=6

24.11.03

16:50

524

184

24.11.03

18:25

All power on 10 mins before L=6 for BM: sc 1,3 into 88m28-68m08-cplxt-apl-60w08, sc 2,4 into 88m28-68m08-cplxy-apl-nw-aph-nw

   

525

184

 

19:31

All change to 88m28-72m12-cplr (-cprl on sc2) at end of BM

   

525

184

 

20:40

All change to 88m28-66h36-cplr (-cprl on sc2) 2 hours after L=6

   

525

184

25.11.03

10:30

Sc 2,3 power off; sc1 changes to 88h58-72m12-cplr and MCP levels dropped by 2 at M+ O

   

525

184

 

12:35

Sc4 powers off for sheath at MP o/b

   

525

184

26.11.03

17:25

Sc4 powers on into 88m28-66h36-cplr at MP i/b

   

525

184

 

18:55

At M+ I, sc2,3 power on into 88m28-66h36-cplr (-cprl on sc2); sc1 changes to 88m28-66h36-cplr and its MCP levels are raised back to operational

   

525

184

27.11.03

00:05

 All change to 88m28-66h36-cplr (-cprl on sc2) 2 hours before L=6, and all power off at L=6

27.11.03

02:05

525

184

 

03:40

Sc 1,2 on in 88m28-72m12-cplr (-cprl on sc2), sc 3,4 into 88m28-68m08-cplr for ASPOC ops

   

526

184

 

05:40

Sc 1,2 change to 88m28-66h36-cplr  (-cprl on sc2) 2 hours after L=6

   

526

184

 

10:40

Sc 3,4 change to 88m28-66h36-cplr at end of ASPOC ops

   

526

184

 

15:00

Sc 3,4 change to 88m28-72m12-cplr for ASPOC ops

   

526

184

 

19:00

Sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM centred on MP

   

526

184

 

22:00

At end of BM, sc 2,3,4 power off, sc1 changes to 88h58-72m12-cplr and MCP levels dropped by 2

   

526

184

29.11.03

02:45

Sc 4 powers on into 88m28-66h36-cplr at MP i/b

   

526

184

 

03:45

Sc 4 changes to 88m28-68m08-cplr for ASPOC ops

   

526

184

 

04:05

At M+ I, sc2 powers on into 88m28-66h36-cprl, sc3 powers on into 88m28-68m08-cplr and sc1 changes to 88m28-66h36-cplr and its MCP levels are raised back to operational

   

526

184

 

08:40

Sc 1,2 change to 88m28-72m12-cplr (-cprl on sc2) 2 hours before L=6 and all power off at L=6

29.11.03

10:40

526

184

29.11.03

12:20

At L=6 all power on into 88m28-72m12-cplr  (-cprl on sc2)

   

527

185

 

14:20

All change to 88m28-66h36-cplr (-cprl on sc2) 2 hours after L=6

   

527

185

 

15:49

MCP operational level test, sensors in 68h38-68h38

       

30.11.03

02:55

Sc 3,4 power off; sc2 changes to 88h58-72m12-cplr and MCP levels dropped by 2 at M+ O

   

527

185

 

04:40

Sc1 powers off for sheath at MP o/b

   

527

185

01.12.03

12:05

Sc1 powers on into 88m28-66h36-cplr at MP i/b

   

527

185

 

13:20

At M+ I, sc3,4 power on into 88m28-66h36-cplr (-cprl on sc2); sc2 changes to 88m28-66h36-cplr and its MCP levels are raised back to operational

   

527

185

 

18:15

 All change to 88m28-66h36-cplr (-cprl on sc2) 2 hours before L=6, and all power off at L=6

01.12.03

20:15

527

185