$pageFileName = "nov2005.php" ?> $pageTitle = "nov2005.php" ?> include "/home/html/www_plasma/plasma_top.inc" ?>
Oct 2005 | Sc1 Calendar | sc2 | sc3 | sc4 |
Power on / Start |
Mode |
Power off |
Orbit # |
Planning period |
||
date |
time |
date |
time |
|||
31.10.05 |
09:20 |
At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2) |
822 |
285 |
||
11:20 |
2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2) |
822 |
285 |
|||
01.11.05 |
20:50 |
At (centroid) M+ all change to 88h58-76m16-cplr (-cprl on sc2) |
822 |
285 |
||
02.11.05 |
12:55 |
At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6 i/b (15:40, sc2) or for manoeuvre firings (16:00, sc 1,3,4) |
02.11.05 |
16:00 |
822 |
285 |
Phasing manoeuvre firings on all spacecraft to change separation from multiscale 10,000km/1000km to regular tetrahedron, side 10,000km |
822 |
285 |
||||
03.11.05 |
04:22 |
After firings all power on into 88m28-66h36-cplr (-cprl on sc2) |
823 |
285 |
||
08:08 |
Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet |
823 |
285 |
|||
10:02 |
At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2) |
823 |
285 |
|||
04.11.05 |
03:35 |
At (centroid) M+ all change to 88h58-76m16-cplr (-cprl on sc2) |
823 |
285 |
||
10:30 |
Sc1 changes to 88m28-76m16-cplxs-aph-80w28, sc2 to 88m28-76m16-cplxy-apl-nw-aph-nw, sc3 to 88h58-76m16-cplxt-apl-68w16, sc4 into 88h58-76m16-cplxy-apl-nw-aph-nw for BM through lobe/plasmasheet (sc 1,2) and possible sheath (sc 3,4) |
823 |
285 |
|||
12:30 |
At end of BM all change back to 88h58-76m16-cplr (-cprl on sc2) |
823 |
285 |
|||
23:50 |
At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and sc 1,2 power off at L=6 i/b |
05.11.05 |
02:20 |
823 |
285 |
|
05.11.05 |
03:10 |
At L=6 o/b sc2 powers on into 88m28-72m12-cprl |
824 |
285 |
||
05.11.05 |
04:05 |
Sc3,4 power off at L=6 i/b |
823 |
286 |
||
04:00 |
At L=6 o/b sc1,3,4 power on into 88m28-72m12-cprl |
824 |
286 |
|||
06:00 |
At L=6 + 2 hrs all change to 88m28-66h36-cplr (-cprl on sc2) |
824 |
286 |
|||
09:00 |
At M+ o/b sc 3,4 change to 88h58-76m16-cplr and LEEA MCPs are lowered by one level |
824 |
286 |
|||
06.11.05 |
13:15 |
Sc1,3 change to 88h58-76m16-cplxt-apl-68w16, sc2 to 88m28-76m16-cplxy-apl-nw-aph-nw and sc4 to 88h58-76m16-cplxy-apl-nw-aph-nw and sc1 LEEA MCP is lowered by one level for BM in (possible) sheath |
824 |
286 |
||
13:50 |
At M+ o/b sc2 changes to 88h58-76m16-cplxy-apl-nw-aph-nw and LEEA MCP is lowered by one level |
824 |
286 |
|||
15:15 |
At end of BM all change back to 88h58-76m16-cplr (-cprl on sc2) |
824 |
286 |
|||
07.11.05 |
01:55 |
At M+ i/b all LEEA MCPs are raised back up to operational |
824 |
286 |
||
06:34 |
MCP op level test performed, sensors in 68h38-68h38, 1hr 31 mins before start of cusp - sc1: 06:34, sc2: 05:49, sc3 07:19, and sc4: 07:54 |
824 |
286 |
|||
07:05 |
At end of test all change to 88h58-76m16-cplr (-cprl on sc2) |
824 |
286 |
|||
08:05 |
At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6 |
07.11.05 |
11:10 |
824 |
286 |
|
07.11.05 |
12:45 |
At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2) |
825 |
286 |
||
14:45 |
2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2) |
825 |
286 |
|||
08.11.05 |
20:00 |
At M+ o/b all change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level |
825 |
286 |
||
09.11.05 |
10:00 |
At M+ i/b sc2 LEEA MCP is raised back up to operational |
825 |
286 |
||
10:05 |
Sc 1,3 change to 88h58-76m16-cplxt-apl-68w16, sc2,4 to 88h58-76m16-cplxy-apl-nw-aph-nw for BM in possible sheath |
825 |
286 |
|||
12:15 |
At M+ i/b sc1 LEEA MCP is raised back up to operational |
825 |
286 |
|||
12:35 |
At end of BM all change back to 88h58-76m16-cplr (-cprl on sc2) |
825 |
286 |
|||
14:50 |
At M+ i/b sc3,4 LEEA MCPs are raised back up to operational |
825 |
286 |
|||
16:45 |
At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6 |
09.11.05 |
20:45 |
825 |
286 |
|
09.11.05 |
22:35 |
At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2) |
826 |
286 |
||
10.11.05 |
00:35 |
2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2) |
826 |
286 |
||
11.11.05 |
03:05 |
At M+ o/b all change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level |
826 |
286 |
||
22:05 |
At M+ i/b all LEEA MCPs are raised back up to operational |
826 |
286 |
|||
12.11.05 |
03:40 |
At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and sc1,2,3 power off at L=6 i/b |
826 |
286 |
||
12.11.05 |
07:00 |
At L=6 o/b sc2 powers on into 88m28-72m12-cprl |
827 |
286 |
||
12.11.05 |
08:00 |
Sc4 powers off at L=6 i/b |
826 |
287 |
||
07:40 |
At L=6 o/b sc1 powers on into 88m28-72m12-cplr, sc3 into 88m28-68m08-cplxs-aph-80w28 in preparation for BM |
827 |
287 |
|||
08:30 |
At start of BM sc1 changes to 88m28-68m08-cplxt-apl-60w08, sc2 to 88m28-76m16-cplxy-apl-nw-aph-nw for BM in auroral zone, cusp and lobe/polar cap |
827 |
287 |
|||
08:55 |
Sc3 changes to 88m28-68m08-cplxt-apl-60w08 at start of cusp |
827 |
287 |
|||
09:30 |
At L=6 sc4 powers on into 88m28-68m08-cplxy-apl-nw-aph-nw |
827 |
287 |
|||
10:18 |
At end of BM sc 1,2,3 change to 88m28-66h36-cplr (-cprl on sc2), sc4 to 88m28-72m12-cplr |
827 |
287 |
|||
11:30 |
2 hours after L=6 sc4 changes to 88m28-66h36-cplr |
827 |
287 |
|||
13.11.05 |
10:25 |
At M+ o/b all change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level |
827 |
287 |
||
13.11.05 |
14:15 |
At M- o/b sc3,4 power off |
827 |
287 |
||
14.11.05 |
04:05 |
At M- i/b sc3,4 power on into 88h58-76m16-cplr, LEEA MCPs lowered by one level |
827 |
287 |
||
08:55 |
At M+ i/b all LEEA MCPs are raised back up to operational |
827 |
287 |
|||
09:49 |
MCP op level test performed, sensors in 68h38-68h38, 1hr 31 mins before start of cusp - sc1,3: 09:49, sc2: 09:29, sc4: 11:19 |
827 |
287 |
|||
10:20 |
At end of test all change to 88h58-76m16-cplr (-cprl on sc2) |
827 |
287 |
|||
11:30 |
At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) |
827 |
287 |
|||
14:25 |
At L=6 i/b sc2 powers off |
827 |
287 |
|||
14:44 |
Sc 1,3,4 power off for firings before L=6 i/b |
827 |
287 |
|||
Drift stop manoeuvre firings on all spacecraft, only trims remain. Spacecraft now in regular tetrahedron formation, side 10,000km |
||||||
15.11.05 |
02:21 |
All power on into 88m28-66h36-cplr (-cprl on sc2) after firings |
828 |
287 |
||
18:05 |
At M+ o/b all change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level |
828 |
287 |
|||
21:00 |
At M- o/b sc3,4 power off |
828 |
287 |
|||
16.11.05 |
13:55 |
At M- i/b sc3 powers on into 88h58-76m16-cplr, LEEA MCP lowered by one level |
828 |
287 |
||
14:46 |
At start of BM sc1,3 change to 88h58-76m16-cplxt-apl-68w16, sc2 changes to and sc4 powers on into 88h58-76m16-cplxy-apl-nw-aph-nw for BM in possible sheath |
828 |
287 |
|||
17:00 |
At M+ i/b sc1,2 LEEA MCPs are raised back up to operational |
828 |
287 |
|||
17:34 |
At end of BM all change back to 88h58-76m16-cplr (-cprl on sc2) |
828 |
287 |
|||
18:05 |
At M+ i/b sc1,2 LEEA MCPs are raised back up to operational |
828 |
287 |
|||
21:55 |
At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6 |
17.11.05 |
00:35 |
828 |
287 |
|
17.11.05 |
02:15 |
At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2) |
829 |
287 |
||
04:15 |
2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2) |
829 |
287 |
|||
18.11.05 |
01:35 |
At M+ o/b all change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level |
829 |
287 |
||
04:15 |
At M- o/b sc3,4 power off |
829 |
287 |
|||
18.11.05 |
23:30 |
At M- i/b sc3 powers on into 88h58-76m16-cplr, LEEA MCP lowered by one level |
829 |
287 |
||
19.11.05 |
00:54 |
At start of BM sc1,3 change to 88h58-76m16-cplxt-apl-68w16, sc2 changes to and sc4 powers on into 88h58-76m16-cplxy-apl-nw-aph-nw for BM in possible sheath |
829 |
287 |
||
01:00 |
At M+ i/b sc2 LEEA MCP is raised back up to operational |
829 |
287 |
|||
02:06 |
At end of BM all change back to 88h58-76m16-cplr (-cprl on sc2) |
829 |
287 |
|||
02:20 |
At M+ i/b sc1,2,3 LEEA MCPs are raised back up to operational |
829 |
287 |
|||
06:25 |
At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) |
829 |
287 |
|||
08:40 |
At L=6 i/b sc2 powers off |
829 |
287 |
|||
08:54 |
Sc 1,3,4 power off for firings before L=6 i/b |
829 |
287 |
|||
Trim manoeuvre firings on all spacecraft |
||||||
20.11.05 |
01:02 |
At end of firings all power on into 88m28-66h36-cplr (-cprl on sc2) |
830 |
288 |
||
09:15 |
At M+ o/b sc 2,3,4 change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level |
830 |
288 |
|||
08:40 |
At start of BM sc1,3 change to 88h58-76m16-cplxt-apl-68w16, sc2 changes to and sc4 powers on into 88h58-76m16-cplxy-apl-nw-aph-nw and sc1 LEEA MCP is lowered by one level for BM through MP |
830 |
288 |
|||
11:40 |
At end of BM sc 1,2,4 change back to 88h58-76m16-cplr (-cprl on sc2) and sc3 powers off at M- |
830 |
288 |
|||
14:15 |
At M- o/b sc2,4 power off and sc1 HEEA MCP is lowered by one level |
830 |
288 |
|||
21.11.05 |
08:10 |
At M- i/b sc2,3,4 power on into 88h58-76m16-cplr (-cprl on sc2), LEEA MCP lowered by one level, and sc1 HEEA MCP is raised back up to operational |
830 |
288 |
||
11:35 |
At M+ i/b all LEEA MCPs are raised back up to operational |
830 |
288 |
|||
12:54 |
MCP op level test performed, sensors in 68h38-68h38, 1hr 31 mins before start of cusp - sc1,2,3: 12:54, sc4: 14:54 |
830 |
288 |
|||
13:25 |
At end of test all change to 88h58-76m16-cplr (-cprl on sc2) |
830 |
288 |
|||
14:25 |
At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) |
830 |
288 |
|||
At L=6 i/b sc1,3,4 power off, sc2 changes to 88m28-68m08-cprl with MCPs lowered by one level for perigee pass with WBD ops |
21.11.05 |
18:30 |
830 |
288 |
||
19:39 |
Sc2 powers off at end of WBD ops |
830 |
288 |
|||
21.11.05 |
20:25 |
At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2) |
831 |
288 |
||
22:25 |
2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2) |
831 |
288 |
|||
22.11.05 |
14:30 |
At M+ o/b sc 2,3,4 change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level |
831 |
288 |
||
16:48 |
At start of BM sc1,3 change to 88h58-76m16-cplxt-apl-68w16, sc2 changes to and sc4 powers on into 88h58-76m16-cplxy-apl-nw-aph-nw and sc1 LEEA MCP is lowered by one level for BM through MP |
831 |
288 |
|||
18:12 |
At end of BM all change back to 88h58-76m16-cplr (-cprl on sc2) |
831 |
288 |
|||
21:30 |
At M- o/b sc2,3,4 power off and sc1 HEEA MCP is lowered by one level |
831 |
288 |
|||
23.11.05 |
17:40 |
At M- i/b sc2,3,4 power on into 88h58-76m16-cplr (-cprl on sc2), LEEA MCP lowered by one level, and sc1 HEEA MCP is raised back up to operational |
831 |
288 |
||
20:50 |
At M+ i/b all LEEA MCPs are raised back up to operational |
831 |
288 |
|||
24.11.05 |
01:30 |
At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6 |
24.11.05 |
03:45 |
831 |
288 |
24.11.05 |
05:25 |
At L=6 o/b sc1,2 power on into 88m28-72m12-cplr (-cprl on sc2), sc3 into 88m28-68m08-cplxs-aph-80w28 |
832 |
288 |
||
05:50 |
At start of BM sc1 changes to 88m28-68m08-cplxt-apl-60w08, sc2 changes to, and sc4 powers on into 88m28-68m08-cplxy-apl-nw-aph-nw; sc4 MCPs one level below operational |
832 |
288 |
|||
06:20 |
Sc3 changes to 88m28-68m08-cplxt-apl-60w08 at start of cusp |
832 |
288 |
|||
06:44 |
At end of BM sc 1,2,3 change back to 88m28-72m12-cplr (-cprl on sc2), sc4 powers off |
832 |
288 |
|||
07:10 |
At L=6 o/b sc4 powers on into 88m28-72m12-cplr |
832 |
288 |
|||
07:25 |
2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2) |
832 |
288 |
|||
25.11.05 |
00:50 |
At M+ o/b all change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level |
832 |
288 |
||
05:05 |
At M- o/b sc2,3,4 power off and sc1 HEEA MCP is lowered by one level |
832 |
288 |
|||
26.11.05 |
03:10 |
At M- i/b sc2,3,4 power on into 88h58-76m16-cplr (-cprl on sc2), LEEA MCP lowered by one level, and sc1 HEEA MCP is raised back up to operational |
832 |
288 |
||
06:05 |
At M+ i/b all LEEA MCPs are raised back up to operational |
832 |
288 |
|||
09:10 |
At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) |
832 |
288 |
|||
12:30 |
At L=6 i/b sc3 powers off, sc1,2 change to 88m28-68m08-cplr with MCPs lowered by one level for perigee pass with WBD ops |
832 |
288 |
|||
13:50 |
Sc1,2 power off at end of WBD ops |
832 |
288 |
|||
26.11.05 |
14:10 |
At L=6 o/b sc1,2 power on into 88m28-72m12-cplr (-cprl on sc2) |
833 |
288 |
||
26.11.05 |
14:25 |
Sc4 powers off at L=6 i/b |
832 |
289 |
||
26.11.05 |
14:30 |
At L=6 o/b sc3,4 power on into 88m28-72m12-cplr |
833 |
289 |
||
16:10 |
2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2) |
833 |
289 |
|||
27.11.05 |
08:50 |
At M+ o/b all change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level |
833 |
289 |
||
09:38 |
At start of BM sc1,3 change to 88h58-76m16-cplxt-apl-68w16, sc2,4 to 88h58-76m16-cplxy-apl-nw-aph-nw for BM through MP |
833 |
289 |
|||
10:32 |
At end of BM all change back to 88h58-76m16-cplr (-cprl on sc2) and sc2 HEEA MCP is lowered by one level |
833 |
289 |
|||
12:45 |
At M- o/b sc1,3,4 power off |
833 |
289 |
|||
28.11.05 |
12:35 |
At M- i/b sc1,3,4 power on into 88h58-76m16-cplr (-cprl on sc2), LEEA MCP lowered by one level, and sc2 HEEA MCP is raised back up to operational |
833 |
289 |
||
15:20 |
At M+ i/b all LEEA MCPs are raised back up to operational |
833 |
289 |
|||
17:04 |
MCP op level test performed, sensors in 68h38-68h38, 1hr 31 mins before start of cusp - sc1,2: 17:04, sc3: 17:29, sc4: 19:34 |
833 |
289 |
|||
17:35 |
At end of test all change to 88h58-76m16-cplr (-cprl on sc2) |
833 |
289 |
|||
18:40 |
At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6 |
28.11.05 |
22:05 |
833 |
289 |
|
28.11.05 |
23:50 |
At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2) |
834 |
289 |
||
29.11.05 |
01:50 |
2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2) |
834 |
289 |
||
16:50 |
At M+ o/b all change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level |
834 |
289 |
|||
16:58 |
At start of BM sc1,3 change to 88h58-76m16-cplxt-apl-68w16, sc2,4 to 88h58-76m16-cplxy-apl-nw-aph-nw for BM through MP |
834 |
289 |
|||
17:52 |
At end of BM all change back to 88h58-76m16-cplr (-cprl on sc2) |
834 |
289 |
|||
20:30 |
At M- o/b sc1,3,4 power off and sc2 HEEA MCP is lowered by one level |
834 |
289 |
|||
30.11.05 |
21:55 |
At M- i/b sc1,3,4 power on into 88h58-76m16-cplr (-cprl on sc2), LEEA MCP lowered by one level, and sc2 HEEA MCP is raised back up to operational |
834 |
289 |
||
01.12.05 |
00:30 |
At M+ i/b all LEEA MCPs are raised back up to operational |
834 |
289 |
||
04:15 |
At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) |
834 |
289 |
|||
07:36 |
At start of eclipse sc4 changes to 88m28-60m00-cplr with internal sunpulse |
834 |
289 |
|||
08:00 |
At end of eclipse sc4 changes back to 88m28-72m12-cplr with external sunpulse |
834 |
289 |
|||
06:55 |
At L=6 i/b all power off |
834 |
289 |