Aug 2005 Sc1 Calendar sc2 sc3 sc4
Oct 2005

Power on / Start

Mode

Power off

Orbit #

Planning period

date

time

date

time

30.08.05

12:40

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

796

276

 

14:10

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

   

796

276

31.08.05

10:10

Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

   

796

276

 

12:10

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

   

796

276

01.09.05

16:10

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

01.09.05

19:55

796

276

01.09.05

21:40

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

797

276

 

23:50

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

   

797

276

02.09.05

16:52

Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

   

797

276

 

19:22

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

   

797

276

04.09.05

02:35

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2)

   

797

276

 

05:30

Sc 1,2 power off at L=6 i/b

   

797

276

04.09.05

07:10

At L=6 o/b sc2 powers on into 88m28-72m12-cprl

   

798

276

   

From pp277 onwards SC1 LEEA MCP level is raised to 25

       

04.09.05

 07:40

Sc 3,4 power off at L=6 i/b

   

797

277

 

07:10

At L=6 o/b sc1 powers on into 88m28-72m12-cplr

   

798

277

 

08:50

At end of o/b cusp sc 1,2 change to 88m28-66h36-cplr (-cprl on sc2)

   

798

277

 

09:25

Sc1 changes to 88m28-76m16-cplxs-aph-80w28, sc2 to 88m28-76m16-cplxy-apl-nw-aph-nw  for BM through lobe, and sc3 powers on into 88m28-68m08-cplxt-apl-60w08 and sc4 into 88m28-68m08-cplxy-apl-nw-aph-nw, for BM through cusp

   

798

277

 

10:55

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

   

798

277

05.09.05

02:34

5 mins before start of eclipse sc2 changes to 88m28-60m00-cprl with internal sunpulse

   

798

277

 

03:34

Sc2 changes back to 88m28-66h36-cprl with external sunpulse 5 mins after end of eclipse

   

798

277

06.09.05

09:44

MCP op level test performed, sensors in 68h38-68h38, 4hrs 31 mins before L=6- sc1: 09:44, sc2: 08:49, sc 3,4: 11:49

   

798

277

 

10:15

At end of test sc 1,2 change to 88m28-66h36-cplr (-cprl on sc2), sc 3,4 to 88m28-72m12-cplr

   

798

277

 

11:15

At start of i/b cusp sc1,2 change to 88m28-72m12-cplr (-cprl on sc2)

   

798

277

06.09.05

13:20

Sc2 powers off at L=6 i/b

   

798

277

 

13:50

Sc1 changes to 88m28-68m08-cplxs-aph-80w28, sc3 to 88m28-68m08-cplxt-apl-60w08, and sc4 to 88m28-68m08-cplxy-apl-nw-aph-nw for BM through auroral zone (sc1) and cusp (sc 3,4)

   

798

277

 

14:15

Sc1 powers off at L=6 i/b

   

798

277

 

14:50

At end of BM sc 3,4 change back to 88m28-72m12-cplr and power off at L=6

06.09.05

16:20

798

277

06.09.05

15:45

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

799

277

 

17:15

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

   

799

277

07.09.05

05:20

Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

   

799

277

 

08:20

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2) then all power off for long eclipse

07.09.05

09:15

799

277

07.09.05

23:30

After long eclipse all power on into 88m28-66h36-cplr (-cprl on sc2)

   

799

277

08.09.05

19:20

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2)

   

799

277

 

22:35

Sc2 powers off at L=6 i/b

   

799

277

 

22:50

Sc1 changes to 88m28-68m08-cplxs-aph-80w28, sc3 to 88m28-68m08-cplxt-apl-60w08, and sc4 to 88m28-68m08-cplxy-apl-nw-aph-nw for BM through auroral zone (sc1) and cusp (sc 3,4)

   

799

277

 

23:30

Sc1 powers off at L=6 i/b

   

799

277

09.09.05

00:20

At end of BM sc 3,4 change back to 88m28-72m12-cplr and power off at L=6

09.09.05

01:55

799

277

09.09.05

01:20

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

800

277

 

03:15

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

   

800

277

 

13:35

Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

   

800

277

 

15:25

Start of sc4 LEEA and HEEA commissioning, this lasts until next power off at 17:51

       
 

16:35

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2) then all power off for long eclipse

09.09.05

17:51

800

277

10.09.05

08:25

After long eclipse all power on into 88m28-66h36-cplr (-cprl on sc2)

   

800

277

11.09.05

06:20

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2)

   

800

277

 

08:45

Sc1,2 power off at L=6 i/b

   

800

277

 

09:25

At L=6 o/b sc2 powers on into 88m28-72m12-cprl

   

801

277

11.09.05

10:50

Sc 3,4 power off at L=6 i/b

   

800

278

11.09.05

10:20

At L=6 o/b sc1 powers on into 88m28-72m12-cplr

   

801

278

 

11:50

At end of o/b cusp sc 1,2 change to 88m28-66h36-cplr (-cprl on sc2)

   

801

278

 

12:00

Sc1 changes to 88m28-76m16-cplxs-aph-80w28, sc2 to 88m28-76m16-cplxy-apl-nw-aph-nw  for BM through lobe

   

801

278

 

12:20

Sc3 powers on into 88m28-68m08-cplxs-aph-80w28, sc4 into 88m28-68m08-cplxy-apl-nw-aph-nw for BM through auroral zone

   

801

278

 

13:00

At start of cusp sc3 changes to 88m28-68m08-cplxt-apl-60w08

   

801

278

 

13:50

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

   

801

278

12.09.05

02:37

All power off for long eclipse

   

801

278

12.09.05

17:00

All power on into 88m28-66h36-cplr (-cprl on sc2) after long eclipse

   

801

278

13.09.05

06:54

Sc2 powers off for HIA test

   

801

278

 

13:55

At start of i/b cusp sc1 changes to 88m28-72m12-cplr

   

801

278

 

14:45

Sc1 changes to 88m28-68m08-cplxt-apl-60w08, sc3 to 88m28-76m16-cplxs-aph-80w28 and sc4 to 88m28-76m16-cplxy-apl-nw-aph-nw for BM in cusp/lobe

   

801

278

 

15:20

At start of i/b cusp sc3 changes to 88m28-68m08-cplxt-apl-60w08, sc4 to 88m28-68m08-cplxy-apl-nw-aph-nw

   

801

278

 

16:09

At end of BM sc 1,3,4 change back to 88m28-72m12-cplr

   

801

278

 

17:25

Sc1 powers off at L=6 i/b

   

801

278

 

17:45

Sc3 changes to 88m28-68m08-cplxs-aph-80w28 and sc4 to 88m28-68m08-cplxy-apl-nw-aph-nw for BM through auroral zone

   

801

278

 

18:45

At end of BM sc 3,4 change back to 88m28-72m12-cplr

   

801

278

 

19:40

Sc 3,4 power off at L=6 i/b

   

801

278

13.09.05

19:05

At L=6 o/b sc 1,3,4 power on into 88m28-72m12-cplr

   

802

278

 

21:05

At end of o/b cusp sc 1,3,4 change to 88m28-66h36-cplr

   

802

278

   

From this power on onwards SC2 HEEA MCP level is raised to 30

       

14.09.05

02:14

Sc2 powers on into 88m28-66h36-cprl at end of HIA test

   

802

278

 

11:06

Sc1 powers off for long eclipse

   

802

278

 

13:04

5 mins before start of eclipse sc3,4 change to 88m28-60m00-cprl with internal sunpulse

   

802

278

 

14:11

Sc 3,4 change back to 88m28-66h36-cplr with external sunpulse 5 mins after end of eclipse

   

802

278

15.09.05

01:30

Sc1 powers on into 88m28-66h36-cplr after long eclipse

   

802

278

 

22:29

MCP op level test performed, sensors in 68h38-68h38, 4hrs 31 mins before L=6- sc1: 22:29, sc2: 21:34, sc 3,4: 00:44

   

802

278

 

23:00

At end of test all change to 88m28-66h36-cplr (-cprl on sc2)

   

802

278

 

23:30

At start of i/b cusp sc 1,2,3 change to 88m28-72m12-cplr (-cprl on sc2)

   

802

278

16.09.05

02:05

Sc2 powers off at L=6 i/b

   

802

278

 

02:30

Sc1 changes to 88m28-68m08-cplxs-aph-80w28, sc3 to 88m28-68m08-cplxt-apl-60w08 and sc4 to 88m28-68m08-cplxy-apl-nw-aph-nw for BM through auroral zone/cusp

   

802

278

 

03:00

Sc1 powers off at L=6 i/b

   

802

278

 

04:00

At end of BM sc 3,4 change back to 88m28-72m12-cplr

   

802

278

 

05:15

Sc 3,4 power off at L=6 i/b

   

802

278

16.09.05

04:45

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

803

278

 

06:25

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

   

803

278

 

18:16

Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

   

803

278

 

19:46

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

   

803

278

 

20:00

Sc1 powers off for long eclipse

   

803

278

17.09.05

09:45

Sc1 powers on into 88m28-66h36-cplr after long eclipse

   

803

278

18.09.05

09:05

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2)

   

803

278

 

11:55

Sc1,2 power off at L=6 i/b

   

803

278

18.09.05

13:25

At L=6 o/b sc 1,2 power on into 88m28-72m12-cplr (-cprl on sc2)

   

804

278

   

From pp279 onwards SC4 HEEA MCP level is raised to 28 and LEEA to 26

       

18.09.05

13:55

Sc 3,4 power off at L=6 i/b

   

803

279

 

15:25

At L=6 o/b sc3,4 power on into 88m28-72m12-cplr

   

804

279

 

14:50

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

   

804

279

20.09.05

15:29

MCP op level test performed, sensors in 68h38-68h38, 1hr 31 mins before start of cusp - sc1: 15:29, sc2: 14:49, sc 3,4: 17:14

   

804

279

 

16:00

At end of test all change to 88m28-66h36-cplr (-cprl on sc2)

   

804

279

 

17:00

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and sc 1,2 power off at L=6

 20.09.05

20:55 

804

279

 

20:55

Sc3 changes to 88m28-68m08-cplxt-apl-60w08, sc4 into 88m28-68m08-cplxy-apl-nw-aph-nw for BM through cusp

   

804

279

 

21:50

At end of cusp sc3 changes to 88m28-68m08-cplxs-aph-80w28 for BM through auroral zone

   

804

279

 

21:50

At L=6 o/b sc2 powers on into 88m28-68m08-cplxy-apl-nw-aph-nw

   

805

279

 

22:25

At end of BM sc 2,3,4 change to 88m28-72m12-cplr (-cprl on sc2) and sc3,4 power off at L=6 i/b

20 .09.05

23:20 

804

279

 

22:50

At L=6 o/b sc1,3,4 power on into 88m28-72m12-cplr

   

805

279

21.09.05

00:45

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

   

805

279

 

12:55

Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through lobe/plasmasheet

   

805

279

 

14:25

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

   

805

279

23.09.05

03:55

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6 i/b

23 .09.05

 06:20

805

279

23.09.05

08:00

At L=6 o/b sc1,2 power on into 88m28-72m12-cplr

   

806

279

 

09:30

At end of o/b cusp sc 1,2 change to 88m28-66h36-cplr (-cprl on sc2)

   

806

279

 

10:10

Sc1 changes to 88m28-76m16-cplxs-aph-80w28, sc2 to 88m28-76m16-cplxy-apl-nw-aph-nw  for BM through lobe; sc3 powers on into 88m28-68m08-cplxs-aph-80w28, sc4 into 88m28-68m08-cplxy-apl-nw-aph-nw for BM through auroral zone

   

806

279

 

10:40

At start of cusp sc3 changes to 88m28-68m08-cplxt-apl-60w08

   

806

279

 

11:25

At end of cusp sc3 changes to 88m28-76m16-cplxs-aph-80w28

   

806

279

 

11:40

At end of BM all change to 88m28-66h36-cplr (-cprl on sc2)

   

806

279

25.09.05

11:45

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and sc1,2 power off at L=6 i/b

25.09.05

15:00

806

279

25.09.05

16:35

At L=6 o/b sc 1,2 power on into 88m28-72m12-cplr (-cprl on sc2)

   

807

279

   

From pp280 onwards, SC3 LEEA MCP level is raised to 29, and SC4 LEEA to 27

       

25.09.05

17:10

Sc 3,4 power off at L=6 i/b

   

806

280

 

18:15

At end of o/b cusp sc 1,2 change to 88m28-66h36-cplr (-cprl on sc2)

   

807

280

   

For the next three power ons, and after MCP test, SC4 HEEA MCP level is lowered manually by ESOC to 26 after possible HV problem

       
 

19:05

Sc1 changes to 88m28-76m16-cplxs-aph-80w28, sc2 to 88m28-76m16-cplxy-apl-nw-aph-nw  for BM through lobe; sc3 powers on into 88m28-68m08-cplxs-aph-80w28, sc4 into 88m28-68m08-cplxy-apl-nw-aph-nw for BM through auroral zone

   

807

280

 

19:35

At start of cusp sc3 changes to 88m28-68m08-cplxt-apl-60w08

   

807

280

 

20:35

At end of BM sc 1,2,3 change to 88m28-66h36-cplr (-cprl on sc2); sc4 to 88m28-72m12-cplr

   

807

280

 

20:55

At end of cusp sc4 changes to 88m28-66h36-cplr

   

807

280

27.09.05

18:29

MCP op level test performed, sensors in 68h38-68h38, 4hrs 31 mins before L=6- sc1,2: 18:29, sc 3,4: 21:39

   

807

280

 

19:00

At end of test all change to 88m28-66h36-cplr (-cprl on sc2)

   

807

280

 

20:20

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

28.09.05

00:30

807

280

28.09.05

02:15

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

808

280

 

03:55

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

   

808

280

 

14:50

Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

   

808

280

 

17:50

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

   

808

280

30.09.05

06:55

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

30.09.05

09:30

808

280

30.09.05

11:00

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

809

280

 

12:25

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

   

809

280

02.10.05

14:35

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and sc1,2 power off at L=6 i/b

02.10.05

18:20

809

280

02.10.05

19:10

At L=6 o/b sc2 powers on into 88m28-72m12-cprl

   

810

280