Solar B - EIS

 

MULLARD SPACE SCIENCE LABORATORY

UNIVERSITY COLLEGE LONDON

Author:  A P Dibbens

 

SOLAR B - EIS  OPEN ACTION ITEMS

 

Document Number:  MSSL/SLB-EIS/AD/002.08    9 July 2000

 

Distribution:

NRL

G Doschek

 

 

 

C Korendyke

 

 

 

S Myers

 

 

 

C Brown

 

 

 

K Dere

 

 

 

J Mariska

 

 

 

 

 

 

ISAS

H Hara

 

 

 

T Watanabe

 

 

RAL

J Lang

 

 

 

B Kent

 

 

 

D Pike

 

 

BU

C Castelli

 

 

 

S Mahmoud

 

 

 

C Goodall

 

 

Mullard Space Science Laboratory

J L Culhane

 

 

 

A Smith

 

 

 

A James

 

 

 

L Harra

 

 

 

A McCalden

.

 

 

C McFee

 

 

 

R Chaudery

 

 

 

P Thomas

 

 

 

R Card

 

 

 

J Tandy

 

 

 

W Oliver

 

 

 

P Coker

 

 

 

R Gowen

 

 

 

K Al Janabi

 

 

 

M Whillock

 

 

       SLB-EIS Project Office

A Dibbens

  Orig

 

 

 

 

 

Author:

 

Date:

 

 

 

 

 

Authorised By:

 

Date:

 

 

 

 

 

Distributed:

 

Date:

 


 

Only open and recently closed Actions are shown

No.

ACTION

By Whom

By When

133

Show wiring harness concept on structure drawing.

MSSL

Mid Sep 00

161

Estimate Occurrence rate of SEU in ICU.          

AJM

End Jul 00

180

Examine structural deformation at a range of delta T’s (new concept).

SM

Mid Aug 00

183

Prepare a plan for managing the Clamshell during TV testing.

CB/SM

End Aug 00

187

Clarify the survival heater requirements and positions and what is their switch on philosophy?

AJM

Closed

201

Two math structural models (with & without launch lock) to be sent to Melco by mid April 2000.

BU

Closed

202

Provide interface and design details of the launch lock by mid April 2000.

BU

Closed

204

Prepare a draft handling procedure for the EIS instrument.

BU

Mid Aug 00

209

Melco to advise the magnetic flux at ICU from the magneto torquer.

HH

Closed

211

MSSL to provide pin/out details for survival heaters.

AJM

End Jul 00

217

Write up detailed description and block diagram for the vacuum MGSE/EGSE required for the Clamshell.

NRL

Closed

221

Provide rise and fall times for all the timing charts (10% of clock period?).

HH

Mid Jul 00

240

Melco to decide on acoustic test levels and provide to EIS and NASA.

HH

Closed

258

Prepare Contamination Control Plan.

RAL

Closed

263

J-side will provide software which will support SDTP protocol.

HH

Mid 2000

264

J-side to provide a facility to see commands as they are sent in the PM EGSE at ISAS

HH

Closed

267

J-side to provide 6 new memory IDs.

HH

Closed

272

Ask Melco to approve envelope change relating to radiator scheme C, with a dimension for the excursion of 350mm.

HH

Closed

277

Identify differences in PM & FM test configurations.

AJM

Closed

278

MSSL to provide pin allocations for ICD.

AJM

End Jul 00

281

Review survival heater power budget for revised survival temperature range.

AJM/

CMC

Closed

284

Provide to MSSL the procurement levels of components that will be directly interfaced to the Bus side power.

HH

End Aug 00

285

Discuss with Melco the nitrogen purging requirements.

HH/CB

End Aug 00

286

Submit updated thermal model reflecting current design changes to EIS.  Provide thermal data at the EIS mounting points to ISAS (data currently in EIS thermal model and needs to be identified to ISAS).

CMC

Closed

287

Develop observation plan for EIS showing mirror movement requirements.

LKH

End Aug 00

289

Continue comparative analysis between JPEG and H-compress. Present results at the upcoming EIS science meeting at MSSL.

LKH

Mid Aug 00

290

Clarify JPEG anomaly noted in TRACE data; identify Q factor used; report anomalies noted in LASCO data from JPEG.

GAD

Closed

293

Submit Solar-B Telemetry/Command Design Standard to MSSL; Japanese version as soon as available, followed shortly with English translated version.

HH

End Aug 00

294

Review high impedance design approach as it applies to differential drives, serial communications and wave shape distortion (reference proposals made by MSSL).

HH

End Apr 01

296

Prepare observation plan for EIS showing when mirror re-points can be conducted.

HH

End Jul 00

297

AOCS to inform what can be tolerated when re-pointing.

HH

End Jul 00

298

Update EIS power budget to include early orbit power requirements (door opening).

AJM

Closed

300

Confirm that all windows for a given slit have the same height.

HH

Closed

301

Sort out the exposure concept for Strong/Weak lines.

HH

Closed

306

Clarification required for EIS attached area (ref par 4.5.1 in ICD)

CMC

Closed

307

Hiro requested information on the heat distribution across EIS

CMC

Closed

308

Expanded par 4.5.5  in the ICD to include optics and sub systems

CMC

Closed

309

Survival heaters need to be added to the ICD, with reference to peak and nominal values.  Confirmation is needed for the values of operational heater power

CMC

Closed

311

Identify questions for Melco on break-out boxes

RAC

Closed

312

Provide details of magnetic components (e.g. motors) for the ICD

AJM

Closed

315

Check on the radiation hardness of the piezo driver

AJM

End July 00

316

Interface needed for vacuum and nitrogen purge requirements

CMC

End July 00

318

Issue EIS operating modes document

KFJ

Closed

319

Clarification is required for the CCD survival heater operation during the CCDs bake-out sequence.

AJM

Mid Sep 00

320

Re-visit survival temperatures in BU/SLB-EIS/TN002.02 page 13.

CMC

End July 00

321

Specify the maximum current and acceptable voltage drop for each power cable

AJM

Mid Aug 00

324

Prepare a document outlining the functionality of the PM (hardware and software) and a proposed test outline

AJM

Closed

326

Update the telemetry document

KFJ

Mid Oct 00

327

Prepare a note on the Low Voltage Differential Signaling (LVDS) parameters

AJM

Mid Aug 00

328

Investigate the survival temperature for the CCDs

CJM

Closed

331

Devise a test method for thermal distortion.

CMC

End Jul 00

332

Include the MLI dimensions on the structure drawing

CMC

Closed

333

AO, BO and CO should be used in future to refer to the attachment points

CMC

Closed

334

Provide a drawing showing any extra holes required in the leg base plate

CMC

Mid Nov 00

335

Look at the implications (particularly mass) of using 10 attachment points for the ICU

MSSL

Mid Jul 00

336

Make a recommendation for the number of cycles for unit level TV testing

MSSL

Mid Jul 00

337

Include environmental tests for the EIS models in the next issue of the ICD together with the test levels

MSSL

Closed

338

Check the instrumentation required for testing the MTM at ISAS

MSSL

Mid Sep 00

339

Melco to provide detailed drawings of the legs, which have been modified with cotter pins

HH

22 Jun 00

340

Provide temperature ranges for each sub assembly to Melco

MSSL

6 Jul 00

341

Provide documents to accompany the Thermal and Structural math models

CMC

Closed

342

Check the implications of the Busy signal being busy when MDP is off. 

MSSL

End Jul 00

343

Provide further information on command and status lists

MSSL

Closed

344

Melco to review the comments/interpretation of the Environmental Test Document tabled by C Brown/S Mahmoud

HH

29 Jun 00

345

Thermally model the first 150minutes of flight

CMC

Mid Oct 00