Meeting Arrangements
Time and Place
From 9am Tuesday January 26, 1999, NRL, Washington DC, Bdg 43 (Management information Center) 2nd floor
Affiliation
Attendee email address
(alphabetical order)
Birmingham University
Saad Mahmoud sm@star.sr.bham.ac.uk
George Simnett gms@star.sr.bham.ac.uk
Cambridge University
Helen Mason h.e.mason@damtp.cam.ac.uk
MSSL, UCL
Len Culhane jlc@mssl.ucl.ac.uk
Louise Harra-Murnion lkhm@mssl.ucl.ac.uk
Matthew Whyndham mwt@mssl.ucl.ac.uk
NAOJ
Hirohisa Hara hara@solar.mtk.nao.ac.jp
NASA-GSFC
Joe Davila davila@lindsay.gsfc.nasa.gov
NASA-MSFC
Larry Hill Larry.Hill@msfc.nasa.gov
NRL
Ken Dere dere@halcyon.nrl.navy.mil
George Doschek doschek@sola.nrl.navy.mil or george.doschek@nrl.navy.mil ?
Uri Feldman
Clarence Korendyke koren@cyclops.nrl.navy.mil
John Mariska mariska@dogwood.nrl.navy.mil
John Seely john.seely@nrl.navy.mil
RAL
Richard Harrison r.harrison@rl.ac.uk
Jim Lang j.lang@rl.ac.uk
Agenda Items
Day 1 - Tuesday 26th January
Introduction
9am. Dr. Timothy Coffey, the NRL Director of Research, will welcome the Solar-B Team.
1. Status
Opening remarks JLC
Conclusion of the US selection process - what of the NRL proposal is still proposed? GAD
Kick-off meeting at ISAS, March 99 HH
2. Science
Review of major science goals JLC/GAD/HH
The Four Wavebands: Science & Countrates KPD/LKHM/All
SERTS observations of HeII JD/
Value of HeII as a transition region line
(comments about CDS experience would be welcome) RAH?
Multilayers at 400 A JFS
What are the prospects for observations in this region?
3. Instrument (telescope) configuration
The NRL Cassegrain Telescope/Spectrometer CK
its properties, advantages, and problems)
Some questions which may arise include …
What are the mechanisms and their nature? (e.g. disturbing torques) NRL
Is there a slit exchange mechanism or a slit/slot? "
Are there focus adjustment mechanisms? "
What are the positional tolerances of the components? "
Is there, or is there a need for, an optical metering subsystem? "
What does the focal surface of the grating look like? "
What are the assumed detector properties (pixel size and format)? "
(Available EEV CCD formats MSSL)
The Baseline (aka trendy) instrument HH?
Other instrumental drivers
4. Selection of EIS Science and Instrumentation
Discussion, with the aim of reaching a decision on the wavebands and telescope type, or at least develop a plan for reaching such a decision by the March meeting in Japan. All
Chair - JLC
Day 2 - Wednesday 27th January, 1999
5. Technical Topics
5.1 Spacecraft resources
Mass, envelope, power, resonances, telemetry, thermal properties, pointing HH
5.2 Structure
vacuum vessel or purged ? Summary of tradeoffs SM?
use of clamshell-protected entrance filter
materials
5.3. Detectors
CCD detector performance MW
Progress with breadboard hardware
5.4 Electronics
System block diagram MW
Operating concepts, data flow, processing cycle /HH
Interface philosophy
MDP interfaces
5.5. General Topics
Alignment, Calibration -> Performance Verification Plan All
Methods of achieving instrument performance - including modelling, subsystem testing and calibration activities
Cleanliness -> Contamination Control Plan - seek LASCO & CDS experience MW/CK?
Subsystem requirements that flow from contamination control methods
6. Technology Management
6.1. Management Plans
Technical coordination in/across institutes MW/All
Common management plan?
Common development teams (SDT / IPDT) ?
Communications:
- Points of contact,
- exchange of documents etc.
6.2. Technical Coordination
Need to discuss/agree on the following:
information to be determined during Phase A about each system interface and approximate times (i.e. agree on the format of the interface documents, including the spacecraft interface control document).
System block diagram and interface list, including spacecraft interfaces
6.3. Events in the Near-future
Kick-off meeting in Japan.
Phase A : Scope and duration
Timing, scope and attendance of Future reviews -
Requirements Review, Preliminary Design Review
7. Resolution of outstanding issues
7.1 Assignment of hardware responsibilities
7.2. Review of actions etc
7.3. Discussion of schedule
8. Conclusion
8.1. Any other business
8.2. Date of next meeting